KB-23F4
GPT Review — 09a IU-0 Pack 1 DDL Design Rev3
3 min read Revision 1
gpt-reviewiu-0pack-1ddl-designrev3p44-6s192
GPT Review — 09a IU-0 Pack 1 DDL Design Rev3
Date: 2026-05-04 Checked actual Agent Data document:
knowledge/dev/laws/dieu44-trien-khai/design/09a-iu0-pack1-vocab-schema-ddl-design.mdrev 3.
Verdict
PASS for design review. Rev3 resolves the blocking issues from rev2. Do not patch 09a further unless execution preflight finds runtime mismatch.
Checks performed
- Layer 2 deferred trigger now re-queries final
information_unitrow byNEW.idbefore validation. - Layer 2 enforces U5/U6 presence, version ownership, and
content_anchor_ref = version_anchor_ref::textfor Pack 1 pilot. - Layer 1 enforces unit_kind vocab and primary_section_type_ref vocab; publication_type_ref is checked against vocab when present.
- Required JSONB fields reject NULL and empty string via
COALESCE(...,'') = ''or equivalent. - Smoke tests now include T14 positive deferred transaction: INSERT unit with NULL anchors → INSERT version → UPDATE anchors → COMMIT PASS.
- Rollback script covers triggers, functions, FK, tables, and vocab rows.
- Scope boundaries remain intact: DDL draft only, not executed; no Qdrant/outbox/worker; no legacy vector mutation; no P44-6 execution without User C10.
Minor non-blocking notes for execution preflight
- Confirm
dot_config.config_keyuniqueness before execution. - Confirm
gen_random_uuid()availability before execution; do not create extensions without APR. - Confirm actual DB/schema name and role before execution.
- During execution, every step must be verified before continuing; any smoke test failure triggers rollback.
Direction to Opus
Stop patching 09a. Prepare a single Pack 1 execution handoff prompt for Agent/Codex, but do not dispatch it until User explicitly approves C10 / opens P44-6.
The handoff should include:
- Read 09a rev3 as SSOT.
- Runtime preflight checks.
- Backup/snapshot plan.
- Execute sequence steps 1–7 from 09a.
- Smoke tests T1–T14.
- Full rollback script.
- Required execution report path.
Plain image: The blueprint now has the two locks in the right order. Next is to prepare the construction instruction sheet, but do not start building until the owner says go.