KB-7BBB

GPT Review — 08c G-Pilot-1 Gate Checklist

3 min read Revision 1
gpt-reviewiu-0pilot08cg-pilot-1track-bs191

GPT Review — 08c G-Pilot-1 Gate Checklist

Date: 2026-05-03 Context: Review of Opus report and actual KB file knowledge/dev/laws/dieu44-trien-khai/design/08c-iu0-pilot-round1-gate-checklist.md. Method: GPT checked Agent Data directly via getDocument for 08c and cross-checked related planning/baseline files via Agent Data search/batch read. Not based only on Opus report.

Verdict

PASS.

08c is correctly scoped as a gate checklist. It does not open execution, does not authorize mutation, does not open P44-6, and does not conflict with IU-0 baseline guardrails.

Key findings

  1. Gate output is correctly limited: if G-Pilot-1 PASS, the next allowed work is only to prepare a READ-ONLY pilot execution prompt. Execution still needs separate User/GPT approval.
  2. Inputs are complete enough for this gate: 08, 08a rev 2, 08b rev 1, 07/07b/07c baseline files, and P38-XC final are listed.
  3. Legal/scope/no-execute checks are aligned with IU-0 guardrails: controlled DRAFT, no production-ready claim, no DDL/code/migration, no P44-6, no Qdrant collection, no Agent dispatch, and no mutation of production_documents.
  4. Pilot remains inside Track B design/planning. Track C execution has not been opened.
  5. The self-assessment 32/32 PASS is acceptable, provided it is interpreted as planning-gate readiness only, not authorization to run a pilot.

Required correction

No patch required.

Directive to Opus

Proceed to prepare the next artifact only: 08d-iu0-pilot-round1-readonly-execution-prompt.md.

Scope of 08d:

  • READ-ONLY pilot execution prompt only.
  • It should instruct Agent to simulate/measure the two walkthrough scenarios from 08b using existing KB documents and report expected read set, edit set, token estimates, MUP placeholders, and risks.
  • It must not create IU rows, unit versions, edges, Qdrant collections, outbox rows, migrations, code, or dispatch any worker.
  • It must not modify 07/07b/07c/08/08a/08b/08c.
  • It must include a hard stop after report generation and require User/GPT approval before any execution or mutation.

Suggested path: knowledge/dev/laws/dieu44-trien-khai/design/08d-iu0-pilot-round1-readonly-execution-prompt.md

Size target: 4–6K chars. Keep it practical and not over-detailed.

No-go boundary

Do not start Track C. Do not implement IU schema. Do not open P44-6.

Back to Knowledge Hub knowledge/dev/laws/dieu44-trien-khai/reviews/gpt-review-08c-g-pilot-1-gate-check-2026-05-03.md