KB-4162
GPT Audit — Completed State vs Opus Feedback
4 min read Revision 1
auditopus-feedbackcompleted-stateinformation-unittext-as-code2026-05-10
GPT Audit — Completed State vs Opus Feedback
Date: 2026-05-10 Author: GPT-5.5 Thinking / Incomex Hội đồng AI Purpose: Audit Opus feedback against KB evidence to avoid rebuilding already completed work.
Verdict
Opus feedback is materially correct: GPT's earlier completed-state list was incomplete. It covered TAC cut/render + recent event_outbox display, but missed IU production machinery, IU design foundation, graph/registry/governance foundations, and pending landmines.
Confirmed completed / present
TAC pipeline
- Text was cut into units / information pieces.
- PG contains 3 publications / 86 units.
- Round-trip 0 drift achieved.
- Directus collections exposed.
- Nuxt
/knowledge/lawsshows 3 publications. - TAC model exists:
tac_publication,tac_logical_unit,tac_unit_version,tac_publication_member. - Render order / publication assembly exists.
- Đ38/P7A segmentation reference exists.
Nuxt / laws reader
- P10D parallel TAC laws screen exists.
/knowledge/lawsand reader page assemble/render publication.
event_outbox display
- D28 generated-map / Nuxt blocker resolved enough.
/knowledge/registries/event_outboxroute public-visible.- Unsafe field probes pass/403 for denied fields.
- Label changed from “Phân loại payload” to “Phân loại dữ liệu”.
- Filter UI config PASS.
- “Thông tin” filter deferred because no
event_domain='information_unit'events exist yet.
IU production machinery
- Pack 22 COMPLETE:
fn_iu_createcanonical writer + IU Creation Gateway enforcement. fn_iu_verify_invariantsand helper functions exist per Pack 22 closure.- Direct INSERT/UPDATE to
information_unit/unit_versionis blocked by gateway marker policy. - IU Creation Gateway README says canonical path is
fn_iu_create_planthenfn_iu_create. - Pack 23 design/inspection/edit workflow anchors exist: P1 design, P2 inspection, P3C2/P3C4 prompts/reviews. Some are design/prompt/approved-for-dispatch, not all implemented.
IU notification machinery
- P3D1 PASS: IU notification schema/functions.
- P3D2 PASS: notification triggers + board, read-state semantics; runtime active for limited use.
- Later universal event/outbox work supersedes/pauses narrow IU-only notification expansion for broader architecture.
Foundations
- P38-XC / IU-0 minimum standard exists with UMC 10 elements as design/contract.
- Đ38 P5 schema draft v0.2 exists as design notation, not production DDL.
- universal_edges exists in meta_catalog CAT-130 with 2199 rows.
- collection_registry/description_policy foundations exist; exact count varies by report/time, must verify live before relying on a fixed count.
- DOT-119 repair arc exists; must avoid old v1 clobber risk and preserve v2/no-clobber behavior.
Confirmed missing / not uploaded
knowledge/dev/laws/dieu44-trien-khai/requirements/p3d-information-unit-text-as-code-requirements-spec.mdis currently NOT_FOUND in Agent Data. Opus claim that spec was drafted but not uploaded is consistent with missing KB path, but GPT cannot verify the 50KB content unless Opus/session provides it.- Companion report path is not confirmed present.
Classification warning
Do not treat every Opus item as implemented runtime. Some are:
- implemented/runtime: Pack 22, P3D1/P3D2, TAC 3 publications/86 units/render proof, event_outbox display.
- design/contract: UMC 10, P38-XC, P5 v0.2, P44 design docs.
- prompt/approved/pending: parts of Pack 23 edit/apply path and Opus first-pass spec.
- landmine/pending: DOT-119 old script/no-clobber preservation.
Next required before work resumes
- Build a definitive completed-state matrix with columns: item, status, evidence path, implemented/design/prompt/pending, do-not-rebuild note.
- Recover/upload Opus first-pass 50KB spec if available, rather than rewriting from zero.
- Only after state matrix + roadmap are accepted, dispatch next implementation/design pack.