dot-iu-cutter v0.6 O9 Ready for Approval PASS Next Program Bundle GPT Ruling
dot-iu-cutter v0.6 O9 Ready for Approval PASS Next Program Bundle
Date: 2026-05-21
O9 is accepted as READY_FOR_SOVEREIGN_APPROVAL. It did not perform production mutation. It kept execution_enabled false, verified the O8F deployment, authored and validated backup_runner, prepared grant and approval packages, and found the safe-target/generic-parser gap.
However, O9 again completed too quickly because the macro stopped when the production-run branch hit the approval gate. Future macros must not stop at the first gated branch if other independent non-mutating branches remain in scope.
Remaining blockers:
- SG approval document for the first orchestrator-managed production run.
- Authorization to flip execution_enabled for the approved run.
- BACKUP_GPG_FPR keypair/operator step.
- Safe target intake and the generic-parser/source pipeline gap.
New macro-sizing rule:
If a branch is blocked by approval, the agent must continue with all other non-mutating branches in the macro scope: source patch design, generic target intake, parser generalization, dry-run suite, grant package, backup package, and approval package. Stop only when all safe branches are exhausted or a true global blocker appears.
Selected next macro: O10_AUTOMATION_COMPLETION_PROGRAM_BUNDLE.
Recommended effort: xhigh. Required start host: MacBook/dev host, because generic-parser/source patch and tests are expected. VPS is used for post-deploy validation and live-readonly/dryrun proof.
O10 scope:
- Precheck Mac and VPS.
- Implement or package generic target source intake and parser path so the system is not ICX-CONST-only.
- Implement safe synthetic/small target dry-run path if possible without production mutation.
- Deploy to VPS with execution_enabled false.
- Run VPS tests and live-readonly/dryrun proof.
- Prepare final approval packet for first automated production run.
- Prepare backup key/operator package and grant package.
- If explicit approvals are still absent, stop at READY_FOR_APPROVAL with all non-mutating branches completed.
Do not perform production mutation without explicit valid approval.