Date: 2026-05-21

O8D is accepted as PASS. The run produced Mac commit cad989a, updated the Contabo v0.6 deployment, kept execution_enabled false, passed 412/412 tests on both Mac and VPS, and completed a rollback-only real DB proof without persistent row changes.

Remaining items after O8D:

  • F1 partial: adapter contract proven; full method follow-up remains.
  • F2 partial: content contract proven; live text sourcing remains.
  • F3 open: LegB and Verify generalization off the Constitution N=60 pin.
  • F4 open: backup readiness.
  • GAP5 open: orchestrator runtime directories and non-sensitive config.
  • GAP6 open: per-cut revert and compensation runbook.
  • GAP7 open: approval package.
  • GAP8 open: safe target document.

The next macro must be larger and multi-deliverable. Selected next macro: O8E_PRE_PRODUCTION_HARDENING_BUNDLE. Recommended effort: high. Default host: VPS. Use Mac only for source commit or artifact creation.

O8E scope:

  1. VPS live precheck.
  2. Runtime dirs and non-sensitive config readiness.
  3. Backup readiness package.
  4. Revert and compensation runbook.
  5. F3 generalization design package.
  6. Safe target discovery and criteria.
  7. Approval package for first orchestrator-managed production run.
  8. Mac command package only if source patch is needed.

Do not perform persistent production changes, real production run, service restart, v0.4 removal, hard delete, or fake PASS.