KB-44CB

dot-iu-cutter v0.6 O7 Post-deploy Live Dry-run PASS GPT Ruling

3 min read Revision 1
dot-iu-cutterv0.6o7postdeploy-live-dryrun-passo8-nextmacro-scope-correctionhigh-effortgpt-ruling2026-05-21

dot-iu-cutter v0.6 O7 Post-deploy Live Dry-run PASS — GPT Ruling

Date: 2026-05-21

Verdict

O7_postdeploy_live_dryrun: PASS
result: O7_POST_DEPLOY_LIVE_DRYRUN_PASS
production_mutation: NONE
execution_enabled: false
live_CUT_VERIFY_enact_mutation: NONE
next_effort: high
macro_scope_correction: expand_next_task_to_45_60min

O7 is accepted. The v0.6 orchestrator deployed on Contabo can perform a live read-only dry-run using current production state while preserving the execution kill-switch and without production mutation.

Accepted evidence

host: Contabo_vmi3080463
v0_6_path: /opt/incomex/dot/iu-cutter-v0.6
sidecar_path: /opt/incomex/dot/iu-cutter-v0.6-o7-sidecar
role: context_pack_readonly
role_is_read_only: true
ICX_CONST:
  total: 60
  enacted: 60
  draft: 0
lifecycle_log_rows: 60
mode_live_refusal: ProductionExecutionNotAuthorized
execution_enabled: false
tests: 366/366 PASS
mutation_check:
  information_unit_before_after: 158_158
  unit_version_before_after: 165_165
  iu_lifecycle_log_before_after: 60_60

Macro sizing correction

The user feedback is accepted: O7 completed in about 12 minutes, too small for the desired 45–60 minute agent utilization. The next macro should be larger and should combine readiness hardening, command-review packaging, sovereign gates, and rollback/disable planning in one task, while still stopping before unauthorized mutation.

Selected next macro

selected_next: O8_PRODUCTION_RUN_READINESS_AND_FIRST_RUN_COMMAND_PACKAGE
recommended_effort: high
expected_duration: 45_60_minutes
scope:
  - live survey before action
  - inspect v0.6 deployed runtime and sidecar results
  - close the remaining gaps for first orchestrator-managed production run
  - decide target selection policy for a harmless document
  - design execution_enabled toggle mechanism without flipping it unless explicitly authorized
  - package backup/restore/rollback/disable plan
  - package first production-run command review
  - if all safe and explicit approval exists in KB, may execute; otherwise stop at approval-ready

Forbidden remains

forbidden:
  - production mutation without explicit sovereign approval discovered in KB
  - enabling execution_enabled without explicit approval
  - live CUT_VERIFY_enact mutation without explicit approval
  - deleting v0.4 skeleton
  - logging secrets
  - real crypto replacement unless explicitly scoped
  - asking user for artifacts or secrets
  - fake PASS

Final status

status: O7_CLOSED_PASS__O8_BIGGER_MACRO_NEXT_HIGH
next_action: run_high_effort_O8_production_run_readiness_and_first_run_command_package_macro
Back to Knowledge Hub knowledge/dev/laws/dieu44-trien-khai/reviews/dot-iu-cutter-v0.6-o7-postdeploy-live-dryrun-pass-gpt-ruling-2026-05-21.md