KB-1B6C
dot-iu-cutter v0.6 IU Parent Child Split Merge Brief Ready GPT Ruling
2 min read Revision 1
dot-iu-cutterv0.6iu-parent-childsplit-mergecodex-passstructure-opsgpt-ruling2026-05-21
dot-iu-cutter v0.6 IU Parent-Child Split/Merge Brief Ready — GPT Ruling
Date: 2026-05-21
Verdict
IU_PARENT_CHILD_SPLIT_MERGE_BRIEF: PASS
result: IU_PARENT_CHILD_SPLIT_MERGE_BRIEF_READY
agent: Codex
production_mutation: NONE
DB_write: NONE
DDL_execution: NONE
pipeline_change: NONE
codex_quota_status: depleted_after_this_track
Codex completed the parent-child / split-merge brief as a non-mutating handoff artifact. This closes the planned small parallel Codex track for now.
Accepted output
KB_path: knowledge/dev/laws/dieu44-trien-khai/v0.6-iu-parent-child-split-merge-brief/
documents:
- iu-parent-child-split-merge-brief-2026-05-21.md
- kb-upload-verification-2026-05-21.md
revision: 1
Accepted scope
covered:
- multi-level parent-child model
- containment / derived_from / supersedes / replaced_by / merged_from / split_from
- add_new_piece / split_large_piece / merge_small_pieces / deprecate/delete workflow needs
- lineage and provenance
- IU-trigger/event integration
- acceptance checklist for future DDL/design macro
Ruling
status: STRUCTURE_OPS_BRIEF_ACCEPTED
next_use: feed_into_later_IU_STRUCTURE_OPS_DESIGN_AND_DDL_AUTHORING
main_track_priority: resume_O8B_retry_from_Mac_for_live_wiring_deploy
Final status
status: CODEX_PARALLEL_PREP_TRACK_CLOSED_FOR_NOW__RETURN_FOCUS_TO_CLAUDE_MAIN_TRACK_O8B