KB-4E53
dot-iu-cutter v0.4 PG-backed Dry-run Pre-execution Halt — GPT Review
3 min read Revision 1
dot-iu-cutterreviewv0.4db-adapterpg-backed-dry-runhalt-correctverification-r3-required
dot-iu-cutter v0.4 — PG-backed Dry-run Pre-execution Halt GPT Review
Date: 2026-05-17
Reviewer: GPT
Reviewed Agent report: knowledge/dev/laws/dieu44-trien-khai/v0.4-db-adapter-dry-run/dot-iu-cutter-v0.4-pg-backed-dry-run-EXECUTION-BLOCKED-pre-provision-2026-05-17.md
Verdict
agent_halt: PASS_CORRECT
execution_status: BLOCKED_PRE_EXECUTION
root_cause: verification_plan_r2_spec_defect
adapter_defect: false
code_change_required: false
production_touched: false
r3_required: true
execution_authorized_now: false
Agent behaved correctly by stopping before provisioning. The accepted code at commit 56d3732 includes sweep() as a canonical happy-path step. Therefore the r2 baseline was wrong.
Accepted Finding
canonical_pipeline_actual:
- MARK
- SWEEP
- REVIEW
- CUT
- VERIFY
r2_wrong_assumption: no_sweep_cycle_invoked
actual_sweep_behavior:
decision_backlog_sweep_log: plus_1
decision_backlog_history: plus_1
Expected actual final baseline from accepted code:
decision_backlog_entry: 1
decision_backlog_history: 5
decision_backlog_dependency: 0
decision_backlog_sweep_log: 1
manifest_envelope: 1
manifest_unit_block: 1
review_decision: 1
dot_pair_signature: 2
cut_change_set: 1
cut_change_set_affected_row: 1
verify_result: 1
canonical_address_alias: 0
total_rows: 15
Boundary Confirmation
dry_run_env_created: false
backup_taken: false
harness_artifact_authored: false
production_connection_beyond_read_only_sysid_catalog: false
production_secret_read: false
production_row_write: false
code_change: false
git_commit_needed: false
Required Remediation
Agent must author verification-plan r3. Scope is verification/design clarification only.
Required changes:
r3_changes:
- add_SWEEP_as_explicit_happy_path_step_between_MARK_and_REVIEW
- update_row_count_matrix_with_after_SWEEP_column
- update_final_baseline_total_from_13_to_15
- update_decision_backlog_history_final_from_4_to_5
- update_decision_backlog_sweep_log_final_from_0_to_1
- update_verdict_rule_references_to_r3_baseline
- keep_negative_and_idempotency_delta_zero_assertions
- keep_G14_to_G25_catalogue_unchanged_unless_cross_reference_needs_numbering
- keep_false_negative_defenses_unchanged
The command-review and report should be revised only where they mention final total or happy-path scenario sequence.
Gate Effect
pg_backed_dry_run_execution: blocked_until_r3_PASS
r2_execution: forbidden
design_DR_1_to_DR_8: still_closed
code_commit_56d3732: still_accepted
Status
ready_for_verification_plan_r3_prompt: true
agent_self_advance_to_execution: prohibited