KB-32C8
dot-iu-cutter v0.2 Phase α Production Command Review — GPT Review
3 min read Revision 1
dot-iu-cutterreviewv0.2phase-alphaproduction-command-reviewpassexecution-ready
dot-iu-cutter v0.2 — Phase α Production Command Review GPT Review
Date: 2026-05-16
Reviewer: GPT
File reviewed: Phase α Production Command Review Package
Scope: Review only. No command executed by GPT.
1. Verdict
phase_alpha_production_command_review_status: PASS
agent_revision_needed: false
production_execution_prompt_allowed: true
production_execution_authorized_by_this_review: false
next_step: explicit_phase_alpha_production_execution_prompt
The command-review package is accepted. Production execution may proceed only under a separate explicit prompt referencing this review.
2. Accepted Command Plan
commands_total: 9
production_mutating_commands: 1
mutating_command: C_07_atomic_r2_migration
conditional_rollback_command: C_09_only_if_C_08_verification_fails_and_explicitly_triggered
safety_gates: 11
DDL_sha256: 65533e0564ee45625b43bff383252ec03f20e284a5cc506d78e1079d6f893fe3
Accepted sequence:
- C-01 fresh production backup;
- C-02 backup checksum/freshness marker;
- C-03 pre-migration schema snapshot;
- C-04 pre-migration row-count and updated_at snapshot;
- C-05 extract/freeze DDL r2 and assert SHA256;
- C-06 preflight checks P-1..P-10;
- C-07 atomic r2 migration with
ON_ERROR_STOP=1; - C-08 post-migration verification;
- C-09 rollback only if verification fails and explicit rollback conditions are satisfied.
3. Mandatory Conditions for Execution Prompt
The production execution prompt must enforce:
- Only Phase α scope.
- Fresh backup less than 60 minutes old at C-07.
- DDL SHA256 exactly
65533e0564ee45625b43bff383252ec03f20e284a5cc506d78e1079d6f893fe3. - All 11 safety gates active.
- Production identity confirmed before C-07.
- C-07 as the only planned mutating production command.
- C-08 verification must pass before success is reported.
- Pre/post updated_at measurement is mandatory.
- Rollback not automatic except in-transaction abort; post-commit rollback needs explicit failure-trigger handling.
- No production CUT/VERIFY, no deploy, no Qdrant/vector mutation.
4. Accepted Side Effect
expected_updated_at_bump: 86_public_tac_logical_unit_rows
accepted_only_if: all_other_checks_pass
non_restorable_by_simple_rollback: true
recoverable_from_fresh_backup: true
5. Status
ready_for_explicit_production_execution_prompt: true
production_execution_allowed_without_prompt: false