dot-iu-cutter v0.2 Phase α Closeout — GPT Review
dot-iu-cutter v0.2 — Phase α Closeout GPT Review
Date: 2026-05-16
Reviewer: GPT
Files reviewed: Phase α handoff/status, post-execution backup verification, next-phase routing note
Scope: Closeout review. No execution, no mutation.
1. Verdict
phase_alpha_closeout_status: PASS
backup_verification_status: PASS
restore_test_status: PASS
agent_revision_needed: false
phase_alpha_complete: true
next_recommended_route: absorb_BR_6_before_P0_2_manifest_design
Phase α is fully closed out.
2. Confirmed Production State
v0_1:
cutter_governance_tables: 5
status: live
v0_2_phase_alpha:
public_tac_logical_unit:
authority: draft_86
canonical_address_format_version: canonical-address-v1_86
sandbox_tac_logical_unit:
authority: null_76
canonical_address_format_version: canonical-address-v1_76
cutter_governance:
canonical_address_alias: exists_zero_rows
status: live
3. Backup Verification
post_phase_alpha_backup_path: /opt/incomex/backups/dieu44_phase_alpha_postexec_verify_20260516T030821Z/phase_alpha_postexec_20260516T030821Z.dump
sha256: 213663c5739e3736b956953bc1dedfc67b847978a3e1a577744c8866ff127902
size_bytes: 64598945
backup_role: workflow_admin
restore_test: PASS
production_untouched: true
The backup contains the Phase α schema state and was verified by both schema-dump grep and restore introspection.
4. Notes
The restore test had one benign directus role error in the ephemeral container. It does not affect schema/data verification because object and row/value introspection passed.
Protected dry-run environments remain retained. No teardown authorized by this review.
5. Direction
Do not start P0-2 manifest design immediately. The next technical step should be BR-6 absorption, because manifest schema can be wrong if split/merge metadata propagation is not resolved first.
next_allowed_work_after_explicit_prompt:
- BR_6_split_merge_TD_absorption
not_allowed_without_new_prompt:
- P0_2_manifest_design
- review_decision_design
- further_migration
- production_CUT_VERIFY