dot-iu-cutter v0.1 Production Command Review Package — GPT Review
dot-iu-cutter v0.1 — Production Command Review Package GPT Review
Date: 2026-05-15
Reviewer: GPT
File reviewed:knowledge/dev/laws/dieu44-trien-khai/execution/dot-iu-cutter-v0.1-p0-production-command-review-package-2026-05-15.md
Scope: Review only. No command executed by GPT.
1. Verdict
production_command_review_package_status: PASS_WITH_SCOPE_RESTRICTION
agent_revision_needed: false
production_execution_authorized_now: false
recommended_next_step: explicit_v0_1_subset_production_execution_prompt
The command review package is acceptable, with one binding scope restriction: v0.1 production execution may ship only the 5-table subset that was validated in the HB-05 26/26 dry-run.
2. Binding Scope Decision
GPT accepts the scope gap identified by Agent and agrees with Opus:
v0_1_allowed_scope:
- decision_backlog_entry
- dot_pair_signature
- cut_change_set
- cut_change_set_affected_row
- verify_result
v0_2_deferred_scope:
- manifest_envelope
- manifest_unit_block
- review_decision
- canonical_address on tac_logical_unit
- decision_backlog_history
- decision_backlog_dependency
- decision_backlog_sweep_log
Reason: only the 5-table subset has direct HB-05 dry-run evidence. Shipping tables/fields without dry-run evidence would violate the governance discipline established for this project.
3. Command Plan Decision
GPT accepts the proposed command plan structure:
- C-01 fresh backup;
- C-02 backup checksum;
- C-03 schema snapshot;
- C-04 row-count snapshot;
- C-05 identity/existence/DOT-pair preflight;
- C-06 DDL checksum gate;
- C-07 dry-run environment health;
- C-08 single-transaction migration with
ON_ERROR_STOP=1; - C-09 post-migration verification;
- C-10 rollback sequence;
- C-11 failure-stop wrapper.
The DDL source must remain checksum-locked to:
/opt/incomex/backups/dieu44_hb05_2026-05-15/schema/cutter_governance_dryrun_v0.1.sql
sha256: 9eb032e2d40d51a1447ad07e5039db8b8b2f83d29b600fb6388c41ec342e4208
4. Conditions Before Execution Prompt
Before production execution starts, the execution prompt must explicitly enforce:
- v0.1 scope restriction to the 5 validated tables only.
- Fresh production-bound backup less than 60 minutes before C-08.
- Checksum verification of the DDL source.
- Production identity preflight.
- Abort if
cutter_governancealready exists. - Abort if DOT-pair rows 991/992 are missing or changed.
- Single transaction for migration.
- Post-migration verification before reporting success.
- Rollback path available but not run unless failure triggers it.
- No production CUT/VERIFY after schema creation.
5. Status
ready_for_explicit_production_execution_prompt: true
execution_authorized_by_this_review: false
v0_2_required: true
v0_2_reason: remaining P0 objects lack dry-run evidence