KB-DDC3
dot-iu-cutter v0.1 Đ32 P0 Risk Review Package — GPT Review
3 min read Revision 1
dot-iu-cutterreviewdieu32risk-reviewp0x-aimplementation-planning-gaterev5d
dot-iu-cutter v0.1 — Đ32 P0 Risk Review Package GPT Review
Date: 2026-05-15
Reviewer: GPT
Files reviewed: Đ32 P0 Risk Review Report, P0 Cross-Cutting Decision Register; plus prior spot-checks of migration design package
Scope: Review only. No implementation, no migration, no PG mutation.
1. Verdict
dieu32_p0_risk_review_package_status: PASS
agent_revision_needed: false
lane_a_standard_items: approve_with_notes
lane_b_high_risk_joint_review: approve_with_notes
implementation_planning_allowed: false
implementation_allowed: false
next_step: close_X-A_design_level_blocker
The Đ32 P0 Risk Review Package is acceptable. It correctly classifies the six P0 items, separates Standard and HIGH-risk lanes, records cross-cutting decisions, and keeps implementation planning closed until X-A is resolved.
2. Confirmed
- Lane A: P0-5, P0-1, P0-2, P0-6 = approve_with_notes.
- Lane B: P0-3 + P0-4 joint = approve_with_notes.
- Risk classes confirmed:
- Standard: P0-5, P0-1, P0-2, P0-6.
- HIGH: P0-3, P0-4.
- Implementation planning remains blocked pending X-A closure + explicit prompt.
- Implementation execution remains blocked.
- No DDL, SQL, migration, PG mutation, implementation planning, or implementation was introduced.
3. GPT Decision on X-A
GPT accepts the recommended X-A option:
X-A_decision: ratify_recommendation
source_span_unit: byte_offsets
axis_1_drift_unit: canonical_token
conversion_required: true
conversion_basis: canonicalization_rule_v0_1
canonicalization_rule_v0_1_placeholder: NFC unicode normalization + LF line endings + trailing whitespace trim for markdown v0.1
Rationale:
- Byte offsets preserve precise source spans for editor/reconstruction use.
- canonical_token drift reduces false drift from whitespace/line-ending noise.
- Conversion keeps MARK spans and VERIFY drift interoperable.
- This aligns P0-2 and P0-4 without forcing AST complexity into v0.1.
4. Required Next Step
Create one X-A ratification closure record. After that, implementation planning gate may become open pending explicit implementation-planning prompt approval.
next_agent_task: create_X-A_ratification_closure_record
implementation_planning_allowed_now: false
implementation_allowed: false