KB-3E23
P3D Pack 1 — Design Addendum + Phase 2 Report
2 min read Revision 1
p3dpack1reportphase2ddl
P3D Pack 1 — Design Addendum + Phase 2 Prompt — Report
Date: 2026-05-11 Author: Opus 4.7
Status
phase_status=PASS
mode=DESIGN_ADDENDUM_AND_PHASE2_PROMPT
pack1_design=PATCHED_WITH_INVENTORY
phase2_prompt=DRAFT_READY_FOR_GPT_REVIEW
implementation_allowed=false
no_mutation_performed=true
next_action=GPT_REVIEW_PHASE2_PROMPT
Deliverables
| # | Output | Path | Status |
|---|---|---|---|
| 1 | Design addendum (full mapping + hash + vocab + fields) | design/p3d-pack1-design-addendum-post-inventory-2026-05-11.md | ✅ |
| 2 | Phase 2 DDL prompt DRAFT | prompts/p3d-pack1-phase2-ddl-extend-implementation-prompt.md | ✅ DRAFT |
| 3 | Report (this file) | reports/p3d-pack1-design-addendum-and-phase2-prompt-report.md | ✅ |
Key Findings from Inventory
- Hash ≠ md5(body) on both sides (100% mismatch) — Phase 2 preflight MUST investigate actual algorithm
- TAC has 11 extra UV columns IU doesn't have — Phase 2 adds 10 of them + 3 LU columns
- Vocab FK on TAC, plain text on IU — reconciliation deferred to Phase 3 (FK addition)
- 0 canonical_address overlap — clean migration space confirmed
- Publication membership intact — 86 members, dense render_order, preserved as separate family
Phase 2 Scope (DDL only, no data)
- ADD 3 columns to information_unit (doc_code, section_type, section_code)
- ADD 10 columns to unit_version (title, description, review_state, provenance, editor, enacted_at, updated_at, vector_sync_status, vector_synced_at, vector_chunk_count)
- All NULLABLE (existing pilot rows get NULL)
- Hash investigation in preflight
- Gateway verify after DDL
- Rollback DDL ready
Report | 2026-05-11 | Opus 4.7