IU-0 Pilot Round 1 — Closure & Decision Pack
IU-0 Pilot Round 1 — Closure & Decision Pack
Phiên: S191 (2026-05-04) Gate: G-Pilot-5 — Round 1 closure Status: Round 1 COMPLETE — 2/2 writable slices PASS
1. Evidence summary: G-Pilot-1 → G-Pilot-4
| Gate | What | Result | Report path |
|---|---|---|---|
| G-Pilot-1 | Gate checklist 32 items | 32/32 PASS | design/08c-iu0-pilot-round1-gate-checklist.md |
| G-Pilot-2 | Tracking metadata 9 slices + 3 vocab | 9/9 tracked, 3 proposed_pilot | reports/iu0-pilot-round1-g-pilot-2-tracking-report.md |
| G-Pilot-3 | Writable slice IU-0.§2 |
PASS — 77% savings, 2 turns | reports/iu0-pilot-round1-g-pilot-3-single-slice-writable-report.md |
| G-Pilot-4 | Writable slice P38-XC.§4 |
PASS — 95% savings, 2 turns | reports/iu0-pilot-round1-g-pilot-4-p38xc-slice-writable-report.md |
Simulation report: reports/iu0-pilot-round1-readonly-simulation-report.md
2. Round 1 results
| Metric | IU-0.§2 (G-Pilot-3) | P38-XC.§4 (G-Pilot-4) |
|---|---|---|
| Doc size | ~8K chars | ~30K chars |
| Slice size | ~1900 chars | ~1500 chars |
| Token savings | 77% | 95% |
| Turn count | 2 | 2 |
| Isolation | ✅ Only §2.2 changed | ✅ Only §4.3 changed |
| Side-effect | None | None |
| Cascade | None | None |
| MUP impact | None (wording only) | None (clarification only) |
Key finding: Token savings tỷ lệ thuận doc size. Doc 30K → 95% savings. Slice editing càng hiệu quả với docs lớn — đúng giả thuyết H1.
H1-H4 verdict:
| Hypothesis | Target | Result |
|---|---|---|
| H1 Token savings ≥50% | ≥50% | ✅ 77% + 95% |
| H2 MUP Tier 0 feasible | 15/15 | ✅ 12/15 thật, 3/15 proposed_pilot (trivial vocab) |
| H3 CRUD hot path no vector block | Design verify | ✅ patch_document = PG-only, no vector in path |
| H4 §Section atom boundary OK | No blocker | ✅ Both slices self-contained, no cascade |
3. Files/revisions changed
| File | Rev before | Rev after | Change |
|---|---|---|---|
design/07-iu0-index-and-core.md |
1 | 2 | §2.2: +pilot status, +merge arrows, +extension policy rule |
design/04-information-unit-profile-schema.md |
1 | 2 | §4.3: +1 câu clarification ranh giới progressive |
design/08a-iu0-pilot-round1-candidate-slices.md |
2 | 6 | Estimate corrections §5/§7, boundary table, vocab risk |
design/08e-iu0-pilot-round1-g-pilot-2-decision-pack.md |
1 | 2 | Full path fix for simulation report |
Không sửa: 07b, 07c, 08, 08b, 08c, 08d. Không tạo table/collection/outbox.
4. Còn chưa làm
| Item | Status |
|---|---|
| IU table trong PG | ❌ Chưa tạo — cần P44-6 |
| IU Qdrant collection | ❌ Chưa tạo — cần APR + GR-9 |
| Outbox worker | ❌ Chưa tạo — cần P44-6 |
| P44-6 Implementation Phase | ❌ Chưa mở — GR-3 |
| DDL/code/migration | ❌ Không — GR-2 |
| Legacy vector mutation | ❌ Không — GR-5 + VG-1 |
| Vocab production registration | ❌ 3 values vẫn proposed_pilot |
| Remaining 7 slices (IU-0 GR/§0/§1/§3/§4 + P38-XC §0/§9) | ❌ Tracked nhưng chưa writable test |
5. Đề xuất next macro track
Round 1 đã chứng minh:
- Slice editing workflow hoạt động thật trên KB docs.
- Token savings 77-95%.
- Không side-effect, không cascade.
patch_documentatomic = isolation guaranteed.
Không cần thêm pilot vi mô. 2 slices trên 2 docs khác nhau (8K + 30K) đã đủ evidence.
Đề xuất: Chuyển sang Minimal Implementation Planning Pack — thiết kế bước đầu tiên để IU-0 có hạ tầng thật (IU table, version table, birth gate trigger). Đây vẫn là planning, chưa phải implementation. Scope:
| Item | Trong scope | Ngoài scope |
|---|---|---|
| IU table schema design (logical) | ✅ | DDL thật ❌ |
| Version table schema design | ✅ | Migration script ❌ |
| Birth gate trigger logic (logical) | ✅ | Trigger code ❌ |
| Outbox table design (logical) | ✅ | Worker code ❌ |
| Qdrant collection config | ❌ | Defer Phase 1 |
| 3 vocab registration chính thức | ✅ | Production registry ❌ (APR) |
Gate: User/GPT approve planning pack trước khi mở P44-6.
6. Câu hỏi User
Có đồng ý:
- Chốt Round 1 COMPLETE?
- Chuyển sang Minimal Implementation Planning Pack?
- Vẫn giữ GR-2 (không DDL/code) và GR-3 (không P44-6) cho planning pack — chỉ mở khi User approve riêng?
Round 1 Closure | S191 | 2/2 PASS | H1-H4 ✅ | Next: Minimal Implementation Planning