KB-2853
dot-iu-cutter v0.1 — Production Handoff & Status (2026-05-15)
11 min read Revision 1
dieu44-trien-khaidot-iu-cutterv0.1production-handoffstatusdocumentation-only2026-05-15
dot-iu-cutter v0.1 — Production Handoff & Status
document_path: knowledge/dev/laws/dieu44-trien-khai/execution/dot-iu-cutter-v0.1-production-handoff-status-2026-05-15.md
revision: r1
date: 2026-05-15
author: Agent (Claude Code CLI, Opus 4.7 1M)
sovereign: User / anh Huyên
verifier: GPT (Đ32 HIGH-risk path)
secondary: Opus
phase: P0 production execution — handoff/status (documentation only)
preceding_authorization_chain:
- HB-01 .. HB-09 closures (9/9 closed_with_notes)
- CTE-01..04 closures (3 closed_with_notes + 1 planning_closed)
- HB-05 26/26 rollback dry-run PASS
- GPT HB-05 review PASS (2026-05-15)
- Final Execution Readiness Re-Run verdict authorize_with_conditions (2026-05-15)
- GPT Command Review PASS_WITH_SCOPE_RESTRICTION (2026-05-15)
- User explicit production execution prompt (2026-05-15)
- Production execution success (2026-05-15 14:15 UTC)
- GPT Production Execution Review PASS (2026-05-15)
§1 — Final Status Summary
dot_iu_cutter_v0_1_production_status: SUCCESS_GPT_RATIFIED
production_execution_complete: TRUE
scope_shipped: v0.1 5-table subset (the exact set that has HB-05 26/26 dry-run evidence)
scope_expanded_beyond_authorization: FALSE
rollback_executed: FALSE
business_data_mutated: FALSE
production_cut_executed: FALSE
production_verify_executed: FALSE
v0.2_objects_created: FALSE
qdrant_mutated: FALSE
directus_app_collection_mutated: FALSE
application_deploy_performed: FALSE
gpt_review_status: PASS (production execution report ratified)
§2 — Production Objects Created
2.1 Schema
schema_name: cutter_governance
database: directus
postgres_container: postgres (production)
postgres_version: PostgreSQL 16.13
host: VPS 38.242.240.89
created_at_utc: 2026-05-15T14:15:39Z
created_by_role: workflow_admin
2.2 Tables (5, all empty)
| Table | P0 mapping | Row count | FK posture (intra-schema only) |
|---|---|---|---|
cutter_governance.decision_backlog_entry |
P0-5 subset | 0 | no incoming FK |
cutter_governance.dot_pair_signature |
P0-3 / P0-4 shared | 0 | self-FK (prior_signature_id); CHECK exactly-one cross-reference |
cutter_governance.cut_change_set |
P0-3 | 0 | FK → dot_pair_signature, decision_backlog_entry |
cutter_governance.cut_change_set_affected_row |
P0-3 | 0 | FK → cut_change_set |
cutter_governance.verify_result |
P0-4 | 0 | FK → cut_change_set, dot_pair_signature, decision_backlog_entry; self-FK (prior_verify_result_id) |
All FKs are intra-schema. No FK crosses out of cutter_governance.
2.3 DDL Source (frozen, bit-for-bit unchanged through execution)
ddl_source_path: /opt/incomex/backups/dieu44_hb05_2026-05-15/schema/cutter_governance_dryrun_v0.1.sql
ddl_source_size: 4949 bytes
ddl_source_sha256: 9eb032e2d40d51a1447ad07e5039db8b8b2f83d29b600fb6388c41ec342e4208
ddl_source_origin: identical artefact validated by HB-05 26/26 PASS
§3 — Backup Artefacts
3.1 Fresh production-bound backup (taken < 60 min before C-08)
path: /opt/incomex/backups/dieu44_exec_2026-05-15/directus_full_20260515T141429Z.dump
size_bytes: 63727124
size_human: 60.8 MiB
sha256: 7d7e424c8437168553b2d25f8a3990f6ae0821f1026810625b14ccaa1a2e389b
backup_window_open_utc: 2026-05-15T14:14:51Z
migration_dispatch_utc: 2026-05-15T14:15:39Z
freshness_at_dispatch: 48 seconds (well within < 60 min)
retention_target: ≥ 30 days per preflight plan §3
3.2 Pre-migration snapshots
schema_snapshot: /opt/incomex/backups/dieu44_exec_2026-05-15/directus_schema_pre_20260515T141429Z.sql sha256 638307fd62d4b1aa087ce7f70f42112c4c6185a2e44d8144a1d859029515668a
rowcount_snapshot: /opt/incomex/backups/dieu44_exec_2026-05-15/directus_rowcounts_pre_20260515T141429Z.psv sha256 56307db958934a32e503fe49432bab47dd5d651d40aca3c7f5804c6f24c448b4
3.3 Post-migration snapshots
schema_snapshot: /opt/incomex/backups/dieu44_exec_2026-05-15/directus_schema_post_20260515T141640Z.sql sha256 0caa68bffa1bd30e0f324523ff90d07638355ec86dfcc6901fd976132f0ef20f
rowcount_snapshot: /opt/incomex/backups/dieu44_exec_2026-05-15/directus_rowcounts_post_20260515T141640Z.psv sha256 4b327e56d6b09ecb53f0da6eb3c6429e9fb3cdb5ed79c7761cac02a4a55625fb
3.4 Checksum manifest
/opt/incomex/backups/dieu44_exec_2026-05-15/SHA256SUMS (5 entries; all artefacts above)
§4 — Verification Summary
V-a schema exists: PASS (cutter_governance present)
V-b exactly 5 tables, all 0 rows: PASS (information_schema cross-check = 5; pg_stat_user_tables shows 5 × 0 rows)
V-c tac_logical_unit unaltered: PASS (pre-existing public.tac_logical_unit.canonical_address column unchanged; ZERO ALTER TABLE statements outside cutter_governance)
V-d DOT-pair 991/992 unchanged: PASS (identity, status, tier, paired_dot, domain, classification, category, token_type, date_created, _dot_origin — all bit-equal to HB-07 closure record)
V-e schema diff = additions-only: PASS (29 additions, all in cutter_governance: 1 CREATE SCHEMA + 5 CREATE TABLE + 18 PG-generated constraint ALTERs + 5 OWNER ALTERs; 0 modifications outside cutter_governance)
V-f row-count diff = new-tables-only: PASS (5 new tables with 0 rows; 0 row-count delta on any pre-existing table)
overall_verification: PASS
Detailed evidence: knowledge/dev/laws/dieu44-trien-khai/execution/dot-iu-cutter-v0.1-production-execution-report-2026-05-15.md §8.
§5 — Rollback Status
rollback_triggered: FALSE
rollback_executed: FALSE
rollback_safety_basis:
- all 5 tables remain empty (0 rows) — DROP SCHEMA cutter_governance CASCADE would be safe today
- no FK from public/other schemas points into cutter_governance
- rollback would restore the pre-migration schema verifiably against directus_schema_pre_20260515T141429Z.sql
rollback_authorization_for_future:
- rollback is NOT pre-authorized
- if needed: separate explicit prompt + Đ32 (HIGH-risk path) + G-4 Custodian co-approval
- Agent does NOT self-authorize rollback
§6 — What Remains Unauthorized
unauthorized_actions:
- production CUT operations (no INSERT into cutter_governance.cut_change_set or cut_change_set_affected_row)
- production VERIFY operations (no INSERT into cutter_governance.verify_result)
- production DOT-pair signature creation (no INSERT into cutter_governance.dot_pair_signature)
- v0.2 migration (deferred objects per §8; requires its own dry-run + command review + explicit prompt cycle)
- application/tooling integration (no client code wired against the new tables; no API exposure; no UI; no service publishing; no scheduled job)
- dry-run environment teardown (must remain UP per final-readiness §4 condition (d))
- rollback (per §5)
- any deploy of Nuxt / dot / agent-data application code referencing the new schema
each_requires_separate_explicit_prompt: TRUE
agent_self_advance: PROHIBITED
§7 — Dry-Run Environment Status
dry_run_env_name: pg-dry-run-hb05-2026-05-15
dry_run_volume: pg-dry-run-hb05-2026-05-15-data
dry_run_image: postgres:16 (PG 16.13)
dry_run_network: bridge (no published host port; isolated)
status_at_handoff: running (UP for ~4 hours at execution time; persistent retained)
teardown_performed: FALSE
recommendation: RETAIN until v0.2 reuse/teardown decision
retention_rationale:
- enables comparative re-execution if production exhibits unexpected behavior in stabilization window
- serves as a working baseline for v0.2 dry-run authoring (one option: extend this env; alternative: build a fresh v0.2 dry-run env)
- teardown costs nothing to defer; tearing down then needing it again is expensive
teardown_authorization: requires a separate explicit teardown prompt
§8 — Next Recommended Actions (no execution implied)
short_term_(within_stabilization_window):
- monitor cutter_governance.* row counts daily; expected = all 0 until a CUT prompt arrives
- leave dry-run env UP
- no client wiring; no integration
medium_term_(after_stabilization):
- decide whether to proceed to v0.2 design cycle (see backlog file §9 below)
- decide whether to retain or teardown the v0.1 dry-run env (separate explicit prompt)
before_first_production_CUT:
- separate explicit prompt authorizing CUT operations
- application-layer enforcement of "exactly-one cross-reference" rule on dot_pair_signature verified in code
- signing scheme v0.1 implementation present and tested
- signal routing for dot_pair_drift + signature_failure wired to G-2 backlog
before_any_v0.2_DDL:
- v0.2 scope backlog (see §9) read and prioritized
- v0.2 dry-run evidence cycle completed (HB-05-equivalent)
- v0.2 command review and GPT PASS
- separate explicit execution prompt
§9 — Cross-References
v0.2_scope_backlog:
knowledge/dev/laws/dieu44-trien-khai/planning/dot-iu-cutter-v0.2-scope-backlog-2026-05-15.md
production_execution_report:
knowledge/dev/laws/dieu44-trien-khai/execution/dot-iu-cutter-v0.1-production-execution-report-2026-05-15.md
command_review_package:
knowledge/dev/laws/dieu44-trien-khai/execution/dot-iu-cutter-v0.1-p0-production-command-review-package-2026-05-15.md
final_readiness_rerun:
knowledge/dev/laws/dieu44-trien-khai/final-readiness/dot-iu-cutter-v0.1-p0-final-execution-readiness-rerun-2026-05-15.md
hb_05_closure:
knowledge/dev/laws/dieu44-trien-khai/blocker-closure/dot-iu-cutter-v0.1-hb-05-rollback-dry-run-closure-2026-05-15.md
§10 — Hard Boundaries (re-stated)
no_production_modification_in_this_handoff: TRUE
no_migration_in_this_handoff: TRUE
no_DDL_in_this_handoff: TRUE
no_SQL_in_this_handoff: TRUE
no_PG_mutation_in_this_handoff: TRUE
no_Qdrant_mutation_in_this_handoff: TRUE
no_Directus_mutation_in_this_handoff: TRUE
no_deploy_in_this_handoff: TRUE
no_teardown_in_this_handoff: TRUE
output_form: handoff_status_documentation_only
End of v0.1 production handoff & status.