KB-7642

dot-iu-cutter v0.1 — P0 Blocker Closure Master Plan

15 min read Revision 1
dot-iu-cutterblocker-closuremaster-planp0no-executionno-ddlrev5d

dot-iu-cutter v0.1 — P0 Blocker Closure Master Plan

Date: 2026-05-15 Status: BLOCKER CLOSURE PROGRAM — ACTIVE (CLOSURE PLANNING ONLY) Trigger: GPT review of Final Execution Readiness Package returned PASS; readiness verdict do_not_authorize stands; execution remains blocked. User has explicitly authorized opening the Blocker Closure Program phase. Scope: CLOSURE PLANNING ONLY. No code, no DDL, no SQL, no migration, no PG mutation, no Qdrant/vector mutation, no Directus mutation, no data write, no backup, no snapshot, no dry-run, no deploy. No blocker is closed in this phase except where the user explicitly prompts a specific closure.


1. Phase Scope

The Blocker Closure Program converts the 9 hard blockers (HB-01..HB-09) + 4 conditions-to-execute (CTE-01..CTE-04) recorded in the Final Readiness Blocker Register into a structured closure program with three workstreams, a dependency graph, an order of execution, and per-blocker acceptance criteria.

This phase plans closure work. It does not perform it.

phase_id: dot-iu-cutter-v0.1-p0-blocker-closure
phase_type: closure_planning_only
phase_authorization: GPT explicit prompt 2026-05-15 (post Final Readiness PASS)
phase_inputs:
  - reviews/dot-iu-cutter-v0.1-final-execution-readiness-package-gpt-review-2026-05-15.md
  - final-readiness/dot-iu-cutter-v0.1-p0-final-readiness-report-2026-05-15.md
  - final-readiness/dot-iu-cutter-v0.1-p0-final-readiness-blocker-register-2026-05-15.md
  - final-readiness/dot-iu-cutter-v0.1-p0-final-execution-readiness-review-2026-05-15.md
  - implementation-planning/dot-iu-cutter-v0.1-p0-implementation-planning-report-2026-05-15.md
phase_outputs:
  - this master plan
  - workstream A (governance / seats / sign-offs)
  - workstream B (vocabulary / schema authority / canonicalization)
  - workstream C (infrastructure / preflight / dry-run readiness)
  - blocker closure dashboard
  - blocker closure report
phase_completion_signals:
  - 6 files produced under knowledge/dev/laws/dieu44-trien-khai/blocker-closure/
  - per-blocker closure approach documented
  - dependency graph + critical path emitted
  - explicit gate status: execution still blocked
phase_does_not_advance_to: execution
next_phase_gate: per-blocker closure sessions (separate phases / separate prompts); re-run Final Readiness Review after each material milestone

2. Hard Boundaries

no_code: true
no_ddl: true
no_sql: true
no_migration_script: true
no_migration_executed: true
no_pg_mutation: true
no_qdrant_mutation: true
no_directus_mutation: true
no_data_writes: true
no_backup_taken: true
no_snapshot_taken: true
no_dry_run_executed: true
no_deploy: true
no_seat_named: true
no_role_created: true
no_dieu37_mutation: true
no_dot_pair_registered: true
no_signature_generated: true
no_blocker_actually_closed_in_this_phase: true (closures occur in separate explicit-prompt sessions)
no_self_advance_to_execution: true
no_phase_prior_file_modified: true
output_form: blocker_closure_planning_only

3. 9 Hard Blockers Summary

hard_blockers (all OPEN per final readiness report §5):
  HB-01:
    title: X-1 schema placement sign-off
    owner: Đ44 family registry custodian + Đ33/Đ43 schema authority
    workstream: B
    blocks_first_ddl: yes
  HB-02:
    title: X-4 Đ24 outstanding ratifications + lookup table population
    owner: Đ24 vocab owner (+ Đ44 cross-family confirmation)
    workstream: B
    blocks_first_ddl: yes
  HB-03:
    title: X-6 dot_pair_signature shape sign-off
    owner: G-4 DOT Registry Custodian + Đ44
    workstream: A
    blocks_first_ddl: yes (Step 5)
    cascades_from: HB-06 (G-4 seat naming)
  HB-04:
    title: X-7 canonicalization rule prose ratification
    owner: Đ24 vocab owner + Đ44 family ratifier
    workstream: B
    blocks_first_ddl: yes (Step 6)
  HB-05:
    title: X-8 rollback test plan dry-run + sign-off
    owner: Đ32 (HIGH-risk path) + G-4
    workstream: C
    blocks_first_ddl: yes
    depends_on: HB-06, HB-03, HB-07, HB-09, CTE-02, CTE-03, CTE-04
  HB-06:
    title: Operational seats G-2, G-4, G-5 named (Đ37)
    owner: Đ37
    workstream: A
    blocks_first_ddl: yes (G-2, G-4, G-5 subset)
  HB-07:
    title: DOT-pair registration (executor + verifier)
    owner: G-4
    workstream: A
    blocks_first_ddl: yes (Step 5+)
    cascades_from: HB-06 (G-4 seat naming)
  HB-08:
    title: Directus backup + restore test
    owner: G-4 + operational DBA
    workstream: C
    blocks_first_ddl: yes
  HB-09:
    title: Schema + row-count snapshots + dry-run environment provisioning
    owner: operational DBA + G-2
    workstream: C
    blocks_first_ddl: yes

4. 4 Conditions-to-Execute Summary

conditions_to_execute (all OPEN per final readiness report §8):
  CTE-01:
    title: failure-stop rule actively enforced at execution time
    owner: G-4 Custodian + operational DBA
    workstream: C
    blocks_first_ddl_effectively: no (planning-level documented)
  CTE-02:
    title: signal routing wired (dot_pair_drift / signature_failure → G-2)
    owner: G-2 + G-4
    workstream: C
    blocks_first_ddl_effectively: yes (via HB-05 dry-run scenarios S02-S05, S18)
  CTE-03:
    title: canonicalization rule library scaffolding (v0.1)
    owner: G-3 oversight + engineering
    workstream: C
    blocks_first_ddl_effectively: yes (via HB-05 scenarios S13, S14, S19, S20)
  CTE-04:
    title: signing scheme v0.1 (hash-based pseudo-signature) implementation
    owner: G-4 + engineering
    workstream: C
    blocks_first_ddl_effectively: yes (via HB-05 scenarios S01-S04)

5. Dependency Graph

                       [HB-06 — Đ37 names G-2, G-4, G-5]
                                       │
              ┌────────────────────────┼────────────────────────┐
              ▼                        ▼                        ▼
        [G-2 named]              [G-4 named]               [G-5 named]
              │                        │                        │
              ▼                        ▼                        │
        [CTE-02 signal             [HB-03 X-6 polish            │
         routing wired             sign-off]                    │
         to G-2 channel]                │                       │
              │                        ▼                        │
              │                  [HB-07 DOT-pair                │
              │                   registration]                 │
              │                        │                        │
              │                        ▼                        │
              │                  [CTE-04 signing                │
              │                   scheme v0.1 impl]             │
              │                        │                        │
              └────────────┬───────────┘                        │
                           │                                    │
                           ▼                                    │
                     [HB-05 rollback test plan dry-run + sign-off]
                           ▲
              ┌────────────┴────────────┐
              │                         │
              ▼                         ▼
        [CTE-03 canon                [HB-09 schema +
         rule lib                     row-count snapshots
         scaffolding                  + dry-run environment]
         depends on
         HB-04 prose]
              │                         │
              ▼                         │
        [HB-04 Đ24 prose                │
         ratification]                  │
                                        │
        [HB-08 backup + restore test    │
         depends on backup target,      │
         can run in parallel with most] │
                                        ▼
        [HB-01 schema placement         [Re-run Final Readiness Review]
         sign-off — Đ44 + Đ33/Đ43       (after material milestones)
         independent path]
                │
                ▼
        [Schema class cutter_governance
         approved for use]

        [HB-02 Đ24 enum ratifications + lookup population — independent path]
                │
                ▼
        [Lookup tables populated for FK use]

5.1 Critical Path

The longest single chain is:

HB-06 (G-4 named)
  → HB-03 (X-6 sign-off)
  → HB-07 (DOT-pair registration)
  → CTE-04 (signing scheme v0.1 impl)
  → HB-05 (rollback test plan dry-run + Đ32 + G-4 sign-off)
  → Re-run Final Readiness Review
  → (gate may open conditionally; still requires user prompt)

Any closure work that parallelizes this chain reduces calendar time. HB-04 + CTE-03 form a parallel chain that ALSO feeds HB-05.

6. Three Workstreams

workstream_a_governance_seats_signoffs:
  file: dot-iu-cutter-v0.1-p0-workstream-a-governance-seats-signoffs-2026-05-15.md
  closures_addressed: [HB-06, HB-03, HB-07]
  cross_cutting_owners: G-3 D4 intake (if needed), G-4 responsibilities, G-5 responsibilities, Đ37 dependency
  primary_authority: Đ37 (seat naming) + G-4 (DOT-pair) + Đ44 (X-6 confirmation)

workstream_b_vocabulary_schema_canonicalization:
  file: dot-iu-cutter-v0.1-p0-workstream-b-vocabulary-schema-canonicalization-2026-05-15.md
  closures_addressed: [HB-01, HB-02, HB-04]
  cross_cutting_decisions: [X-1, X-4, X-7]
  primary_authority: Đ44 + Đ33/Đ43 (X-1) + Đ24 (X-2/X-4/X-7) — note X-2 already selected, X-3 already selected

workstream_c_infrastructure_preflight_dryrun:
  file: dot-iu-cutter-v0.1-p0-workstream-c-infrastructure-preflight-dryrun-2026-05-15.md
  closures_addressed: [HB-08, HB-09, HB-05, CTE-01, CTE-02, CTE-03, CTE-04]
  primary_authority: G-4 + operational DBA + G-2 (signal channel) + Đ32 (HIGH-risk dry-run sign-off)

7. Order of Execution for Closure Work

sequence_overview:
  step_1_start: HB-06 (operational seat naming under Đ37) — gates downstream A items + CTE-02
  step_2_parallel:
    - HB-01 (X-1 schema placement sign-off) — independent of HB-06
    - HB-02 (X-4 Đ24 enum ratification + lookup population) — independent of HB-06
    - HB-04 (X-7 canonicalization rule prose ratification) — independent of HB-06
    - HB-08 (Directus backup + restore test) — independent of HB-06
    - HB-09 (snapshots + dry-run environment) — independent of HB-06
  step_3_after_G_4_named:
    - HB-03 (X-6 dot_pair_signature shape sign-off) — requires G-4 named
    - HB-07 (DOT-pair registration) — requires G-4 named
  step_4_after_HB_04_ratified:
    - CTE-03 (canonicalization rule library scaffolding) — uses prose from HB-04
  step_5_after_HB_03_signed:
    - CTE-04 (signing scheme v0.1 implementation) — uses shape from HB-03
  step_6_after_G_2_named:
    - CTE-02 (signal routing wired) — uses G-2 channel
  step_7_after_all_preconditions:
    - HB-05 (rollback test plan dry-run + Đ32 + G-4 sign-off) — depends on HB-06, HB-03, HB-07, HB-09, CTE-02, CTE-03, CTE-04
  step_8:
    - Re-run Final Readiness Review (separate session)
  step_9:
    - if re-run verdict transitions to authorize / authorize_with_conditions → explicit user prompt to authorize execution
  step_10:
    - execution phase (FIRST time DDL/SQL/migration is allowed)

8. What Can Run in Parallel

parallel_workstreams_possible:
  - workstream A item HB-06 + workstream B items HB-01, HB-02, HB-04 + workstream C items HB-08, HB-09
  - HB-04 + CTE-03 form a parallel chain to HB-06 → HB-03 → HB-07 → CTE-04
sequential_constraints_within_critical_path:
  - HB-06 must close G-4 named before HB-03 / HB-07 can close
  - HB-03 must close before CTE-04 can close
  - HB-07 must close before HB-05 dry-run scenarios involving DOT-pair signatures
  - HB-04 must close before CTE-03 can close
  - HB-09 must close before HB-05 dry-run executes (needs dry-run environment)
  - CTE-02 wiring must close before HB-05 scenarios that observe signal channels
  - HB-05 must close LAST before Final Readiness Review re-run
must_be_sequential:
  - HB-06 G-4 → HB-03 → HB-07 → CTE-04 → HB-05
  - HB-04 → CTE-03 → HB-05
  - HB-09 → HB-05
  - HB-06 G-2 → CTE-02 → HB-05
parallel_to_critical_path:
  - HB-01 schema placement (independent of seat naming; needed for first DDL but not for HB-05 dry-run if dry-run uses an isolated environment)
  - HB-02 Đ24 enums + lookup population (independent of seat naming; needed for first DDL)
  - HB-08 backup + restore test (independent; needed for production execution)

9. What Remains Forbidden in This Phase

forbidden_in_this_phase:
  - actually naming any seat
  - actually creating any role
  - actually registering any DOT
  - actually signing off any cross-cutting decision
  - actually ratifying any Đ24 / Đ44 / Đ33/Đ43 artefact
  - actually taking any backup
  - actually taking any snapshot
  - actually provisioning any environment
  - actually scaffolding any library
  - actually implementing any signing scheme
  - actually wiring any signal channel
  - actually executing any dry-run
  - actually writing any DDL / SQL / migration script
  - actually mutating PG / Qdrant / Directus
  - actually authorizing execution
  - self-advancing to execution
forbidden_unless_user_explicitly_prompts_specific_closure: true

10. Authority Map for Closure Work

Workstream Closure Authority
A HB-06 G-2 / G-4 / G-5 named Đ37
A HB-03 X-6 polish sign-off G-4 + Đ44
A HB-07 DOT-pair registration G-4
B HB-01 schema placement sign-off Đ44 + Đ33/Đ43
B HB-02 Đ24 enum ratifications + lookup population Đ24 + Đ44
B HB-04 canonicalization rule prose ratification Đ24 + Đ44
C HB-08 Directus backup + restore test G-4 + operational DBA
C HB-09 snapshots + dry-run environment operational DBA + G-2
C CTE-01 failure-stop enforcement G-4 + operational DBA
C CTE-02 signal routing G-2 + G-4
C CTE-03 canonicalization library scaffolding G-3 oversight + engineering
C CTE-04 signing scheme v0.1 implementation G-4 + engineering
C HB-05 rollback test plan dry-run + sign-off Đ32 (HIGH-risk) + G-4
Re-run Final Readiness Review Đ32 (HIGH-risk path) + Đ44 + Đ37 + G-4 (sign-offs)
execution authorization explicit user prompt

11. Status

master_plan_status: COMPLETE
files_in_package_target: 6 (this master + 3 workstream files + dashboard + report)
blocker_closure_program_created: true
blockers_closed: false
execution_authorized: false
code_written: false
ddl_written: false
sql_written: false
migration_executed: false
pg_mutation: false
qdrant_mutation: false
directus_mutation: false
seat_named: false
role_created: false
dot_pair_registered: false
backup_taken: false
snapshot_taken: false
dry_run_executed: false
phase_prior_file_modified: false