Codex Review - LEGO Pilot Slice 0 R2-B2 Planning Bundle
STATUS: PASS_WITH_CAVEATS
REPORT_DATE: 2026-06-18
OFFICIAL_KB_PATH: knowledge/dev/laws-new/reports/codex/codex-review-lego-pilot-slice-0-r2-b2-planning-bundle-2026-06-18.md
REVIEW_SCOPE: Independent read-only control review of the five-file LEGO Pilot Slice 0 R2-B2 planning bundle.
0. Operating Position
Three declarations:
- Permanent: this review accepts only design-only planning boundaries; it does not authorize B2 TD, staging build, pilot execution, or remediation.
- Mistake-resistant: B2 remains the only primary block, B5/B7 remain dependencies, and no channel/staging/test plan can bypass Owner gates.
- Automatic: no automation, staging corpus, channel wiring, runtime test, or next package is started here; Owner must choose the next exact scope.
Control principles applied: read target files directly from AgentData KB in the main process, treat AgentData metadata as authoritative, preserve inherited caveats, distinguish engineering PASS from authority PASS, reject actual TD drift, reject channel-authority drift, reject staging schema/corpus drift, and do not treat local scratch as official storage.
Executive Summary
- The five files are valid design-only planning deliverables for LEGO Pilot Slice 0 around R2-B2.
- The macro remains LEGO despite larger scope: B2 is the only primary block; B5 backlog and B7 gate policy remain dependencies only.
- Channel decision is recommendation-only. Host cron and agent-api executor are candidates; pg_cron and job_queue are risky/future-gated; manual one-shot is rejected as standing channel. No channel is selected as authority.
- B2 Technical Design readiness correctly says actual B2 TD is aggregate No-Go today: readiness is specified but not met.
- Staging/kho-tam is IO contract only: no schema, table, DDL, SQL, corpus, live extraction, or production/canonical write.
- Bad-input/delete-fast is a verification plan only: tests are defined, expected rejections and evidence are specified, but no test is run and no runtime result is claimed.
- Status is PASS_WITH_CAVEATS because inherited caveats remain open, B2/staging/test behavior is conceptual-only, and readiness is explicitly No-Go today.
| File |
Expected |
Observed |
Verdict |
Issue |
| knowledge/dev/laws-new/newlaws/consolidation/r2-d2-b2-channel-decision-packet-lego-2026-06-18.md |
revision 1, content_length 36106 |
revision 1, content_length 36106 |
PASS |
None |
| knowledge/dev/laws-new/newlaws/consolidation/r2-b2-technical-design-readiness-lego-2026-06-18.md |
revision 1, content_length 27230 |
revision 1, content_length 27230 |
PASS |
None |
| knowledge/dev/laws-new/newlaws/consolidation/lego-pilot-slice-0-staging-io-contract-2026-06-18.md |
revision 1, content_length 26736 |
revision 1, content_length 26736 |
PASS |
None |
| knowledge/dev/laws-new/newlaws/consolidation/lego-pilot-slice-0-bad-input-delete-fast-verification-plan-2026-06-18.md |
revision 1, content_length 22302 |
revision 1, content_length 22302 |
PASS |
None |
| knowledge/dev/laws-new/newlaws/reports/lego-pilot-slice-0-r2-b2-planning-bundle-execution-report-2026-06-18.md |
revision 1, content_length 14951 |
revision 1, content_length 14951 |
PASS |
None |
Metadata convention audit:
- All five target files exist at exact KB paths.
- Editorial revision is distinct from AgentData metadata.
- File bodies do not pin volatile storage revision/content_length.
- AgentData metadata at read time is treated as authoritative.
- Exactly five deliverables are treated as outputs.
- No sixth file, schema file, corpus file, code file, or staging-surface file is treated as output.
Source-Read / No-Parallel-Agent Audit
| Check |
Verdict |
Issue |
| Sources read directly from AgentData KB |
PASS |
Bundle states 19/19 sources read first-hand from AgentData KB. |
| No parallel reader-agents |
PASS |
Explicitly avoided. |
| No background reader-agents |
PASS |
Explicitly avoided. |
| No sub-agent outsourcing for reading |
PASS |
Reads stated as main-process only. |
| Reads bounded/sequential |
PASS |
One document per batch_read call, full read; large source decoded locally by main process only. |
| No fact inferred from local prose or memory |
PASS |
Explicitly stated. |
| Item |
Verdict |
Issue |
| v0.1-stable / FIX7 V3 baseline |
PASS |
Preserved as reproducibility/comparison/regression fixture; not overwritten. |
| FIX7 Recheck-9/current Codex packet use |
PASS |
No promotion or modification. |
| Tool-Kiem-Thu v0.2-hardening |
PASS |
Separate dev track; not authority for FIX7. |
| v0.2 authority confusion |
PASS |
Rejected across bundle, including bad-input BAD-10. |
Deliverable Audit
| Deliverable |
Verdict |
Issue |
| A - R2-D2 Channel Decision Packet |
PASS |
Complete design-only comparison; no channel selected; manual one-shot rejected as standing channel. |
| B - B2 Technical Design Readiness |
PASS_WITH_CAVEAT |
Readiness specified correctly, but aggregate status is No-Go today. No actual TD opened. |
| C - Staging / Kho-tam IO Contract |
PASS |
IO contract only; no schema/table/DDL/SQL/corpus/live extraction. |
| D - Bad-input / Delete-fast / Verification Plan |
PASS_WITH_CAVEAT |
Complete verification plan, but conceptual only; no tests run and no runtime behavior proven. |
| E - Execution Report |
PASS |
Reports exactly five files, source-read checks, completion table, non-authorization audit, scope-control audit, and self-check. |
Channel Decision Audit
| Channel |
Verdict |
Issue |
| host cron |
PASS |
Candidate only; no cron spec or wiring authorized. |
| agent-api executor |
PASS |
Candidate only; no contract bind/promotion or runner execution authorized. |
| pg_cron |
PASS_WITH_CAVEAT |
Risky/future-gated because pg_cron is not installed; no install authorized. |
| job_queue worker |
PASS_WITH_CAVEAT |
Risky/future-gated due disabled/idle queue and undrained event_outbox failure mode; no worker enable authorized. |
| manual one-shot |
PASS |
Rejected as standing channel; B5 one-shot backlog remains separate and Owner-gated. |
| final channel selected as authority |
PASS |
No channel selected. |
| scheduler/runner/cron spec written |
PASS |
No implementation spec found. |
| B5 backlog smuggled into B2 |
PASS |
No; B5 remains separate. |
TD Readiness Audit
| Check |
Verdict |
Issue |
| Readiness only, not actual TD |
PASS |
No schema/implementation mechanics. |
| Actual B2 TD aggregate No-Go today |
PASS |
Explicit No-Go with multiple No-Go/Partial criteria. |
| D0-G source/rule-set not authoritatively recovered |
PASS |
Listed as SOURCE_RECOVERY_REQUIRED. |
| Channel not selected |
PASS |
R2-D2 is comparison only. |
| S2 producer owner not assigned |
PASS |
Listed as No-Go. |
| Staging/kho-tam surface not built |
PASS |
IO contract exists only. |
| S8 rollback/downstream-certify unresolved |
PASS |
Marked Partial/FUTURE_TD_REQUIRED. |
| Bad-input behavior conceptual only |
PASS |
Runtime tests not possible until producer exists. |
| Blockers remain open |
PASS |
All listed open. |
Staging IO Audit
| Check |
Verdict |
Issue |
| Staging input contract defined |
PASS |
Disposable projection shape, not live extraction plan. |
| Staging output contract defined |
PASS |
Candidate inspect results only on disposable surface. |
| Forbidden staging outputs defined |
PASS |
Production inspect_*, certify, canonical, identity, KG writes forbidden. |
| Candidate-vs-production separation |
PASS |
B4 never sees staging candidates. |
| Evidence contract |
PASS |
Staging evidence append-only and distinct from production S7. |
| Delete-fast boundary |
PASS |
One disposal unit. |
| Rollback boundary |
PASS |
One staging run; deletion is rollback. |
| No-production-touch proof requirement |
PASS |
Required as future proof; not claimed now. |
| Compatibility with B2/B3/B4 |
PASS |
Mirrors B3 shape; B4 not run in staging. |
| Bad-input handling in staging |
PASS |
Same fail-closed D0-G rules. |
| No staging schema/table/DDL/SQL/corpus/live extraction |
PASS |
None found. |
| Check |
Verdict |
Issue |
| Missing entity_code |
PASS |
BAD-1 defined with rejection/evidence. |
| Missing collection_name |
PASS |
BAD-2 defined. |
| Already certified=true |
PASS |
BAD-3 skip/no-write. |
| Partial inspect_* unknown origin |
PASS_WITH_CAVEAT |
BAD-4 defined; conceptual/policy unclear until implementation. |
| D0-G rule-set unresolved |
PASS_WITH_CAVEAT |
BAD-5 SOURCE_RECOVERY_REQUIRED. |
| Request to set certified=true |
PASS |
BAD-6 rejects. |
| Request to set canonical_address |
PASS |
BAD-7 rejects. |
| Blanket inspect_*=now() |
PASS |
BAD-8 rejects fused shortcut. |
| Channel not approved / owner missing |
PASS |
BAD-9 no-op/pending Owner. |
| v0.2-hardening as authority |
PASS |
BAD-10 rejects. |
| Out-of-order STAMP/GATE |
PASS |
BAD-11 rejects. |
| Out-of-scope governance_role |
PASS_WITH_CAVEAT |
BAD-12 defined; observed-role policy caveat preserved. |
| Audit event used as approval |
PASS |
BAD-13 rejects. |
| Candidate result written to production field |
PASS |
BAD-14 rejects/fails pilot. |
| Delete-fast fails to remove candidate output |
PASS |
BAD-15 rejects staging design. |
| Expected rejection behavior defined |
PASS |
Present for all BAD-1..BAD-15. |
| Fail-open conditions defined |
PASS |
F-OPEN-1..F-OPEN-10 present. |
| Evidence required for rejection/delete-fast/rollback/no-touch |
PASS |
Sections define evidence requirements. |
| Minimal pilot acceptance criteria all-of |
PASS |
Single fail-open fails pilot. |
| Test run claimed |
PASS |
No test run; no runtime result claimed. |
Execution Report Audit
| Check |
Verdict |
Issue |
| Exactly five files reported |
PASS |
Five listed; no extra deliverable. |
| Source-read/no-parallel checks included |
PASS |
Present and complete. |
| Completion table covers all five deliverables |
PASS |
Present. |
| Non-authorization audit complete |
PASS |
Covers runtime, corpus, schema, TD, implementation, tool lock. |
| Scope-control audit explicit |
PASS |
Checks B2-only, B5/B7 separate, channel no authority, staging no schema/corpus. |
| Self-check passes |
PASS |
No self-check failed. |
LEGO / Scope-Control Audit
| Check |
Verdict |
Issue |
| B2 remains inspect-only |
PASS |
Reads uncertified rows, writes inspect_* only conceptually. |
| B5 backlog dependency only |
PASS |
Not opened; one-shot backlog remains separate. |
| B7 gate policy dependency only |
PASS |
Not opened; no warn-to-block flip. |
| No mega-birth pipeline |
PASS |
Fused shortcut rejected; no interlocked runtime design. |
| No mega-registry |
PASS |
Staging not second SSOT; no registry schema/corpus. |
| No hidden shared write surface |
PASS |
Owner gates retained; no production/canonical writes. |
| Channel internal/replaceable |
PASS |
Channel is not block boundary. |
| Staging disposable IO boundary |
PASS |
IO contract only. |
| Delete-fast verification plan only |
PASS |
No delete mechanism or runtime execution. |
Technical-Design Drift Audit
| Check |
Verdict |
Issue |
| Schema DDL / table definition |
PASS |
None found. |
| Migration plan / function body |
PASS |
None found. |
| SQL mutate plan / exact command sequence |
PASS |
None found. |
| Producer implementation |
PASS |
None found. |
| Scheduler / cron implementation plan |
PASS |
Channel comparison only. |
| Runner build plan |
PASS |
None found. |
| Rollback script |
PASS |
None found. |
| Backlog execution plan |
PASS |
None found; B5 separate. |
| Concrete staging schema / live extraction plan |
PASS |
None found. |
| Runtime execution steps |
PASS |
None found. |
Future Write / Owner-Gate Audit
| Future action |
Verdict |
Issue |
| Select B2 channel as authority |
PASS |
Forbidden now; Owner decision required. |
| Wire host cron |
PASS |
Forbidden now. |
| Bind/promote agent-api contract |
PASS |
Forbidden now. |
| Install pg_cron |
PASS |
Forbidden now. |
| Enable job_queue worker |
PASS |
Forbidden now. |
| Assign producer owner |
PASS |
Forbidden now. |
| Recover D0-G source |
PASS |
Forbidden now; Owner out-of-band. |
| Build staging surface |
PASS |
Forbidden now. |
| Populate staging sample |
PASS |
Forbidden now. |
| Run B2 candidate against staging |
PASS |
Forbidden now. |
| Run bad-input tests |
PASS |
Forbidden now. |
| Generate no-touch runtime evidence |
PASS |
Forbidden now; only evidence requirements defined. |
| Build S7 evidence writers |
PASS |
Forbidden now. |
| Define/execute rollback mechanism |
PASS |
Forbidden now. |
| Run B5 backlog pass |
PASS |
Forbidden now. |
| Flip B7 warn-to-block |
PASS |
Forbidden now. |
| Write inspect_* to production |
PASS |
Forbidden now. |
| Set certified=true |
PASS |
Forbidden now. |
| Promote staging candidate to production |
PASS |
Forbidden now. |
Non-Authorization Audit
- DB write/DDL/DML performed/authorized? no
- restart/reload performed/authorized? no
- runner/job/cron/worker execution performed/authorized? no
- DOT/KG/birth/certify/promote execution performed/authorized? no
- inspect/certified writes performed/authorized? no
- gate flip / owner assignment / contract promotion authorized? no
- pg_cron install / queue worker enable authorized? no
- source/prior-report patch performed/authorized? no
- current corpus created/authorized? no
- staging corpus/schema created/authorized? no
- actual technical design authorized? no
- implementation authorized? no
- blocker resolved? no
- v0.1-stable/FIX7 V3 overwritten? no
- v0.2-hardening promoted or used as authority? no
Primary Review Questions
- Are the five files valid design-only planning deliverables? yes, with caveats.
- Did the macro remain LEGO despite larger scope? yes.
- Is B2 still the only primary block? yes.
- Are B5 and B7 kept as dependencies only? yes.
- Is the channel decision recommendation-only? yes.
- Is no channel selected as authority? yes.
- Is actual B2 Technical Design still not opened? yes.
- Is B2 TD readiness correctly marked aggregate No-Go today? yes.
- Is staging/kho-tam kept as IO contract only? yes.
- Is no staging schema/corpus/live extraction created or authorized? yes.
- Is delete-fast kept as verification expectation only? yes.
- Are bad-input tests defined but not run? yes.
- Are all future writes Owner-gated and forbidden? yes.
- Is further Claude patch needed before acceptance? no.
Next-Step Decision
- Is the planning bundle accepted? yes, as design-only planning with caveats.
- Is Owner selection required before actual B2 TD? yes.
- Is write-enabled remediation authorized now? no.
- Is actual technical design authorized now? no.
- Is a channel selected as authority now? no.
- Recommended next action: Owner chooses whether to open actual B2 Technical Design with selected channel, standalone R2-D2 channel decision, or another sibling design-only TD-prep. No automatic TD or remediation follows.
Final Recommendation
- Further Claude patch needed? no.
- Owner can use this bundle for next decision? yes, with caveats retained.
- Default next action: Owner decision on exact next scope.
- Do not implement confirmation: do not implement, do not mutate runtime, do not run DDL/DML, do not write actual TD, do not resolve blockers, do not create staging/current corpus, do not select/wire channel, do not install pg_cron, do not enable queue workers, do not write inspect_* or certified=true, do not run tests, do not promote staging output, do not overwrite v0.1-stable/FIX7 V3, and do not promote v0.2-hardening as authority.