KB-2436

Codex Review - LEGO Pilot Slice 0 R2-B2 Planning Bundle - 2026-06-18

16 min read Revision 1
codex-reviewlego-pilot-slice-0r2-b2planning-bundledesign-onlyread-only

Codex Review - LEGO Pilot Slice 0 R2-B2 Planning Bundle

STATUS: PASS_WITH_CAVEATS REPORT_DATE: 2026-06-18 OFFICIAL_KB_PATH: knowledge/dev/laws-new/reports/codex/codex-review-lego-pilot-slice-0-r2-b2-planning-bundle-2026-06-18.md REVIEW_SCOPE: Independent read-only control review of the five-file LEGO Pilot Slice 0 R2-B2 planning bundle.

0. Operating Position

Three declarations:

  • Permanent: this review accepts only design-only planning boundaries; it does not authorize B2 TD, staging build, pilot execution, or remediation.
  • Mistake-resistant: B2 remains the only primary block, B5/B7 remain dependencies, and no channel/staging/test plan can bypass Owner gates.
  • Automatic: no automation, staging corpus, channel wiring, runtime test, or next package is started here; Owner must choose the next exact scope.

Control principles applied: read target files directly from AgentData KB in the main process, treat AgentData metadata as authoritative, preserve inherited caveats, distinguish engineering PASS from authority PASS, reject actual TD drift, reject channel-authority drift, reject staging schema/corpus drift, and do not treat local scratch as official storage.

Executive Summary

  • The five files are valid design-only planning deliverables for LEGO Pilot Slice 0 around R2-B2.
  • The macro remains LEGO despite larger scope: B2 is the only primary block; B5 backlog and B7 gate policy remain dependencies only.
  • Channel decision is recommendation-only. Host cron and agent-api executor are candidates; pg_cron and job_queue are risky/future-gated; manual one-shot is rejected as standing channel. No channel is selected as authority.
  • B2 Technical Design readiness correctly says actual B2 TD is aggregate No-Go today: readiness is specified but not met.
  • Staging/kho-tam is IO contract only: no schema, table, DDL, SQL, corpus, live extraction, or production/canonical write.
  • Bad-input/delete-fast is a verification plan only: tests are defined, expected rejections and evidence are specified, but no test is run and no runtime result is claimed.
  • Status is PASS_WITH_CAVEATS because inherited caveats remain open, B2/staging/test behavior is conceptual-only, and readiness is explicitly No-Go today.

Files / Metadata Audit

File Expected Observed Verdict Issue
knowledge/dev/laws-new/newlaws/consolidation/r2-d2-b2-channel-decision-packet-lego-2026-06-18.md revision 1, content_length 36106 revision 1, content_length 36106 PASS None
knowledge/dev/laws-new/newlaws/consolidation/r2-b2-technical-design-readiness-lego-2026-06-18.md revision 1, content_length 27230 revision 1, content_length 27230 PASS None
knowledge/dev/laws-new/newlaws/consolidation/lego-pilot-slice-0-staging-io-contract-2026-06-18.md revision 1, content_length 26736 revision 1, content_length 26736 PASS None
knowledge/dev/laws-new/newlaws/consolidation/lego-pilot-slice-0-bad-input-delete-fast-verification-plan-2026-06-18.md revision 1, content_length 22302 revision 1, content_length 22302 PASS None
knowledge/dev/laws-new/newlaws/reports/lego-pilot-slice-0-r2-b2-planning-bundle-execution-report-2026-06-18.md revision 1, content_length 14951 revision 1, content_length 14951 PASS None

Metadata convention audit:

  • All five target files exist at exact KB paths.
  • Editorial revision is distinct from AgentData metadata.
  • File bodies do not pin volatile storage revision/content_length.
  • AgentData metadata at read time is treated as authoritative.
  • Exactly five deliverables are treated as outputs.
  • No sixth file, schema file, corpus file, code file, or staging-surface file is treated as output.

Source-Read / No-Parallel-Agent Audit

Check Verdict Issue
Sources read directly from AgentData KB PASS Bundle states 19/19 sources read first-hand from AgentData KB.
No parallel reader-agents PASS Explicitly avoided.
No background reader-agents PASS Explicitly avoided.
No sub-agent outsourcing for reading PASS Reads stated as main-process only.
Reads bounded/sequential PASS One document per batch_read call, full read; large source decoded locally by main process only.
No fact inferred from local prose or memory PASS Explicitly stated.

Tool/Packet Lock Audit

Item Verdict Issue
v0.1-stable / FIX7 V3 baseline PASS Preserved as reproducibility/comparison/regression fixture; not overwritten.
FIX7 Recheck-9/current Codex packet use PASS No promotion or modification.
Tool-Kiem-Thu v0.2-hardening PASS Separate dev track; not authority for FIX7.
v0.2 authority confusion PASS Rejected across bundle, including bad-input BAD-10.

Deliverable Audit

Deliverable Verdict Issue
A - R2-D2 Channel Decision Packet PASS Complete design-only comparison; no channel selected; manual one-shot rejected as standing channel.
B - B2 Technical Design Readiness PASS_WITH_CAVEAT Readiness specified correctly, but aggregate status is No-Go today. No actual TD opened.
C - Staging / Kho-tam IO Contract PASS IO contract only; no schema/table/DDL/SQL/corpus/live extraction.
D - Bad-input / Delete-fast / Verification Plan PASS_WITH_CAVEAT Complete verification plan, but conceptual only; no tests run and no runtime behavior proven.
E - Execution Report PASS Reports exactly five files, source-read checks, completion table, non-authorization audit, scope-control audit, and self-check.

Channel Decision Audit

Channel Verdict Issue
host cron PASS Candidate only; no cron spec or wiring authorized.
agent-api executor PASS Candidate only; no contract bind/promotion or runner execution authorized.
pg_cron PASS_WITH_CAVEAT Risky/future-gated because pg_cron is not installed; no install authorized.
job_queue worker PASS_WITH_CAVEAT Risky/future-gated due disabled/idle queue and undrained event_outbox failure mode; no worker enable authorized.
manual one-shot PASS Rejected as standing channel; B5 one-shot backlog remains separate and Owner-gated.
final channel selected as authority PASS No channel selected.
scheduler/runner/cron spec written PASS No implementation spec found.
B5 backlog smuggled into B2 PASS No; B5 remains separate.

TD Readiness Audit

Check Verdict Issue
Readiness only, not actual TD PASS No schema/implementation mechanics.
Actual B2 TD aggregate No-Go today PASS Explicit No-Go with multiple No-Go/Partial criteria.
D0-G source/rule-set not authoritatively recovered PASS Listed as SOURCE_RECOVERY_REQUIRED.
Channel not selected PASS R2-D2 is comparison only.
S2 producer owner not assigned PASS Listed as No-Go.
Staging/kho-tam surface not built PASS IO contract exists only.
S8 rollback/downstream-certify unresolved PASS Marked Partial/FUTURE_TD_REQUIRED.
Bad-input behavior conceptual only PASS Runtime tests not possible until producer exists.
Blockers remain open PASS All listed open.

Staging IO Audit

Check Verdict Issue
Staging input contract defined PASS Disposable projection shape, not live extraction plan.
Staging output contract defined PASS Candidate inspect results only on disposable surface.
Forbidden staging outputs defined PASS Production inspect_*, certify, canonical, identity, KG writes forbidden.
Candidate-vs-production separation PASS B4 never sees staging candidates.
Evidence contract PASS Staging evidence append-only and distinct from production S7.
Delete-fast boundary PASS One disposal unit.
Rollback boundary PASS One staging run; deletion is rollback.
No-production-touch proof requirement PASS Required as future proof; not claimed now.
Compatibility with B2/B3/B4 PASS Mirrors B3 shape; B4 not run in staging.
Bad-input handling in staging PASS Same fail-closed D0-G rules.
No staging schema/table/DDL/SQL/corpus/live extraction PASS None found.

Bad-Input / Delete-Fast Audit

Check Verdict Issue
Missing entity_code PASS BAD-1 defined with rejection/evidence.
Missing collection_name PASS BAD-2 defined.
Already certified=true PASS BAD-3 skip/no-write.
Partial inspect_* unknown origin PASS_WITH_CAVEAT BAD-4 defined; conceptual/policy unclear until implementation.
D0-G rule-set unresolved PASS_WITH_CAVEAT BAD-5 SOURCE_RECOVERY_REQUIRED.
Request to set certified=true PASS BAD-6 rejects.
Request to set canonical_address PASS BAD-7 rejects.
Blanket inspect_*=now() PASS BAD-8 rejects fused shortcut.
Channel not approved / owner missing PASS BAD-9 no-op/pending Owner.
v0.2-hardening as authority PASS BAD-10 rejects.
Out-of-order STAMP/GATE PASS BAD-11 rejects.
Out-of-scope governance_role PASS_WITH_CAVEAT BAD-12 defined; observed-role policy caveat preserved.
Audit event used as approval PASS BAD-13 rejects.
Candidate result written to production field PASS BAD-14 rejects/fails pilot.
Delete-fast fails to remove candidate output PASS BAD-15 rejects staging design.
Expected rejection behavior defined PASS Present for all BAD-1..BAD-15.
Fail-open conditions defined PASS F-OPEN-1..F-OPEN-10 present.
Evidence required for rejection/delete-fast/rollback/no-touch PASS Sections define evidence requirements.
Minimal pilot acceptance criteria all-of PASS Single fail-open fails pilot.
Test run claimed PASS No test run; no runtime result claimed.

Execution Report Audit

Check Verdict Issue
Exactly five files reported PASS Five listed; no extra deliverable.
Source-read/no-parallel checks included PASS Present and complete.
Completion table covers all five deliverables PASS Present.
Non-authorization audit complete PASS Covers runtime, corpus, schema, TD, implementation, tool lock.
Scope-control audit explicit PASS Checks B2-only, B5/B7 separate, channel no authority, staging no schema/corpus.
Self-check passes PASS No self-check failed.

LEGO / Scope-Control Audit

Check Verdict Issue
B2 remains inspect-only PASS Reads uncertified rows, writes inspect_* only conceptually.
B5 backlog dependency only PASS Not opened; one-shot backlog remains separate.
B7 gate policy dependency only PASS Not opened; no warn-to-block flip.
No mega-birth pipeline PASS Fused shortcut rejected; no interlocked runtime design.
No mega-registry PASS Staging not second SSOT; no registry schema/corpus.
No hidden shared write surface PASS Owner gates retained; no production/canonical writes.
Channel internal/replaceable PASS Channel is not block boundary.
Staging disposable IO boundary PASS IO contract only.
Delete-fast verification plan only PASS No delete mechanism or runtime execution.

Technical-Design Drift Audit

Check Verdict Issue
Schema DDL / table definition PASS None found.
Migration plan / function body PASS None found.
SQL mutate plan / exact command sequence PASS None found.
Producer implementation PASS None found.
Scheduler / cron implementation plan PASS Channel comparison only.
Runner build plan PASS None found.
Rollback script PASS None found.
Backlog execution plan PASS None found; B5 separate.
Concrete staging schema / live extraction plan PASS None found.
Runtime execution steps PASS None found.

Future Write / Owner-Gate Audit

Future action Verdict Issue
Select B2 channel as authority PASS Forbidden now; Owner decision required.
Wire host cron PASS Forbidden now.
Bind/promote agent-api contract PASS Forbidden now.
Install pg_cron PASS Forbidden now.
Enable job_queue worker PASS Forbidden now.
Assign producer owner PASS Forbidden now.
Recover D0-G source PASS Forbidden now; Owner out-of-band.
Build staging surface PASS Forbidden now.
Populate staging sample PASS Forbidden now.
Run B2 candidate against staging PASS Forbidden now.
Run bad-input tests PASS Forbidden now.
Generate no-touch runtime evidence PASS Forbidden now; only evidence requirements defined.
Build S7 evidence writers PASS Forbidden now.
Define/execute rollback mechanism PASS Forbidden now.
Run B5 backlog pass PASS Forbidden now.
Flip B7 warn-to-block PASS Forbidden now.
Write inspect_* to production PASS Forbidden now.
Set certified=true PASS Forbidden now.
Promote staging candidate to production PASS Forbidden now.

Non-Authorization Audit

  • DB write/DDL/DML performed/authorized? no
  • restart/reload performed/authorized? no
  • runner/job/cron/worker execution performed/authorized? no
  • DOT/KG/birth/certify/promote execution performed/authorized? no
  • inspect/certified writes performed/authorized? no
  • gate flip / owner assignment / contract promotion authorized? no
  • pg_cron install / queue worker enable authorized? no
  • source/prior-report patch performed/authorized? no
  • current corpus created/authorized? no
  • staging corpus/schema created/authorized? no
  • actual technical design authorized? no
  • implementation authorized? no
  • blocker resolved? no
  • v0.1-stable/FIX7 V3 overwritten? no
  • v0.2-hardening promoted or used as authority? no

Primary Review Questions

  1. Are the five files valid design-only planning deliverables? yes, with caveats.
  2. Did the macro remain LEGO despite larger scope? yes.
  3. Is B2 still the only primary block? yes.
  4. Are B5 and B7 kept as dependencies only? yes.
  5. Is the channel decision recommendation-only? yes.
  6. Is no channel selected as authority? yes.
  7. Is actual B2 Technical Design still not opened? yes.
  8. Is B2 TD readiness correctly marked aggregate No-Go today? yes.
  9. Is staging/kho-tam kept as IO contract only? yes.
  10. Is no staging schema/corpus/live extraction created or authorized? yes.
  11. Is delete-fast kept as verification expectation only? yes.
  12. Are bad-input tests defined but not run? yes.
  13. Are all future writes Owner-gated and forbidden? yes.
  14. Is further Claude patch needed before acceptance? no.

Next-Step Decision

  • Is the planning bundle accepted? yes, as design-only planning with caveats.
  • Is Owner selection required before actual B2 TD? yes.
  • Is write-enabled remediation authorized now? no.
  • Is actual technical design authorized now? no.
  • Is a channel selected as authority now? no.
  • Recommended next action: Owner chooses whether to open actual B2 Technical Design with selected channel, standalone R2-D2 channel decision, or another sibling design-only TD-prep. No automatic TD or remediation follows.

Final Recommendation

  • Further Claude patch needed? no.
  • Owner can use this bundle for next decision? yes, with caveats retained.
  • Default next action: Owner decision on exact next scope.
  • Do not implement confirmation: do not implement, do not mutate runtime, do not run DDL/DML, do not write actual TD, do not resolve blockers, do not create staging/current corpus, do not select/wire channel, do not install pg_cron, do not enable queue workers, do not write inspect_* or certified=true, do not run tests, do not promote staging output, do not overwrite v0.1-stable/FIX7 V3, and do not promote v0.2-hardening as authority.
Back to Knowledge Hub knowledge/dev/laws-new/reports/codex/codex-review-lego-pilot-slice-0-r2-b2-planning-bundle-2026-06-18.md