C1 W7 pre-apply — 07 dot-c1-grant-issue lifecycle (NOT EXECUTED; no orphan) 2026-06-23
07 — B3 · Register dot-c1-grant-issue via Full DOT Lifecycle
Result: NOT EXECUTED. Gated by Phase A HOLD.
State (unchanged)
dot_toolsWHEREcode LIKE 'dot-c1-%'= 0 (before == after). Nodot-c1-grant-issueregistered.
Design intent (documented, NOT done)
dot-c1-grant-issue must be a proposer, not a writer: it calls dot-apr-propose --action-code authorize_build_step and must NOT POST directly to Directus governance_build_authorization, must NOT INSERT a grant row, must NOT hardcode a grant, must NOT use the defective staged schema. Its full lifecycle (reuse-first search → birth → governance/admission → registration → dot_tools/CAT-006 catalog → DOT-manage ledger → rollback/retire → orphan check) is deferred to the apply phase, which was not entered.
Anti-orphan
No DOT was created, registered, or partially staged in any governed registry this run. Therefore there is no orphan DOT to reconcile (GOVERNED_C1_DRYRUN_REJECT_ORPHAN_DOT did not fire). dot_tools total = 309, unchanged.
B3: NOT EXECUTED (gated). Zero orphan DOTs. before == after.