Read-Only Next-Macro Scale Plan (25–30 Deliverables, 2026-06-18)
Read-Only Next-Macro Scale Plan (25–30 Deliverables)
Date: 2026-06-18 · Workstream: LEGO-PILOT-SLICE-0-R2-B2-READONLY-EVIDENCE-OWNER-PATH-MACRO-2026-06-18 (Deliverable 25 of 30) · Editorial revision: rev1
Class: read-only sequencing plan (next macro) · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO macro authorized · NO write performed.
Metadata convention. Editorial revision (rev1) only. AgentData storage revision/
content_lengthauthoritative at read time; not pinned here.
Scale-plan lock. This packet plans the next 25–30-deliverable macro without fragmenting work. It authorizes no macro, opens nothing, selects no channel. Scale the prompt, not the coupling; each deliverable a separate control surface; no tier transitions automatically.
0. Status and non-authorization
STATUS: PASS — engineering / design-only. A recommended next-macro plan (Macro-2: the Owner-decision/OOB prerequisites) scaled to 25–30 separate deliverables. Engineering PASS ≠ authority PASS. Default disposition: HOLD. No macro authorized; no channel selected; no TD; no DB write/DDL/DML; no blocker resolved.
Evidence basis — design synthesis of Deliverables 1–24. Reading discipline: main process, no reader-agents.
1. Purpose
Answer macro question 10: what should the next macro be, at 25–30 deliverables, without fragmenting work? §5 is the plan.
The one rule: scale prompt size and deliverable count, never coupling. The next macro is the Mega Gate roadmap's Macro-2 (channel decision + Đ0-G source authority + S2 owner) — three independent decisions delivered as separate control surfaces, plus their supporting read-only/decision deliverables.
2. Sources / evidence read
Deliverable 3 (path selection → Path 2 + 3 + 4), Deliverable 25-context (Mega Gate Next-3 Macro Roadmap). Read directly, main process.
3. Accepted baseline (carried)
Mega Gate roadmap: Macro-1 (read-only re-verify) → Macro-2 (channel/Đ0-G/owner decisions, separate deliverables) → Macro-3 (staging build readiness → separate build gate) → (separate gate) actual B2 TD. This macro executed Macro-1's read-only re-verification. The next macro is Macro-2.
4. Anti-fragmentation rule (carried)
A larger macro is fine if every deliverable stays a separate, independently reviewable, discardable control surface; no deliverable depends on another's internals; no automatic planning→TD→implementation transition; B2 stays the only primary block; B5/B7 stay dependency-only; the channel stays internal and unselected. A macro that fuses these is NOT_LEGO_COMPATIBLE → HOLD.
5. Next-macro scale plan — Macro-2 (recommended, 25–30 deliverables; Owner-gated, not authorized here)
A single larger macro carrying three independent Owner-decision/OOB lanes as separate deliverables, each with its own readiness/options/proof/review surface:
| Group | Deliverables (separate control surfaces) | Lane |
|---|---|---|
| Channel decision (Path 2) | (a) channel options re-statement (recommendation-only); (b) host-cron decision-readiness; (c) agent-api decision-readiness; (d) channel selection-record template (Owner fills); (e) per-DOT no-coupling proof obligations; (f) channel liveness proof plan (read-only where possible) | R2-D2 |
| Đ0-G source authority (Path 3) | (g) recovery options brief (recover vs accept-with-caveat); (h) recovered/accepted rule-set acceptance template; (i) STAMP/GATE least-precedented risk note; (j) Constitution-reference-patch readiness (documentary) | Đ0-G / S6 |
| S2 producer owner (Path 4) | (k) owner-assignment decision brief (Điều 37→32); (l) governance-object-ownership read-only re-confirm; (m) owner-assignment record template | S2 |
| Cross-cutting | (n) updated gate delta after Macro-2 decisions; (o) updated No-Go closure matrix; (p) updated blocker classification; (q) bad-input/oracle carry; (r) S7/S8 carry; (s) R1/KG invariant re-cross-check; (t) staging readiness carry; (u) waiver map update; (v) Codex review packet; (w) execution report | synthesis |
That is ~23 deliverables; the macro may add per-channel proof sub-deliverables to reach 25–30 without coupling (each remains separate). No deliverable selects the channel, recovers Đ0-G, or assigns the owner — they prepare the Owner's three decisions as separate, reviewable artifacts. Actual B2 TD remains a later, separate gate (Macro-3 then a TD gate), not part of Macro-2.
Why this, not Path 6 now: aggregate B2 TD is NO-GO; GATE-4/5 are non-waivable and open. Macro-2 closes exactly those Owner-decision/OOB prerequisites. Path 7 (B5/B7) is rejected as scope creep and is not in the plan.
6. Owner-gated future work
| Future work | Gate required | Forbidden now? |
|---|---|---|
| Open Macro-2 | Owner authorization | Yes |
| Take any of the three decisions (channel/Đ0-G/owner) | Owner decision / external S6 | Yes |
7. What remains unresolved
- Macro-2 is planned, not authorized.
- The three decisions remain the Owner's; this plan prepares, it does not decide.
- Blockers — all OPEN.
8. Ready for GPT/Codex review
Yes — as a read-only next-macro scale plan.
Core rule: the next macro is Macro-2 (channel + Đ0-G + S2 owner) at 25–30 separate deliverables — scale the prompt, not the coupling; no decision taken, no channel selected, no macro authorized; Path 7 excluded.
Default disposition: HOLD. Engineering PASS ≠ authority PASS. All blockers remain OPEN.