KB-5086

Mega Gate — No-Go Closure Matrix (R2-B2)

15 min read Revision 1

Mega Gate — No-Go Closure Matrix (R2-B2)

Date: 2026-06-18 · Workstream: LEGO-PILOT-SLICE-0-B2-MEGA-GATE-BUNDLE-2026-06-18 (Deliverable 2 of 20) · Editorial revision: rev1 Class: design-only / closure analysis / decision-support · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NOT remediation · NOT technical design · NOT implementation · NO blocker resolved · NO runtime touched.

Metadata convention. Editorial revision (rev1) only. AgentData storage revision and content_length are authoritative in AgentData metadata at read time; not pinned in this body.

Closure-analysis lock. This packet classifies how each open criterion could be closed — by read-only evidence, by an Owner decision, by out-of-band recovery, or only behind a write gate. It closes nothing, resolves no blocker, and authorizes no act. "Closeable by read-only evidence" describes a future read-only step that is itself Owner-gated; nothing is verified here.


0. Status and non-authorization

STATUS: PASS — engineering / design-only. This is a complete closure analysis: for each Go/No-Go criterion (G-1…G-11) and each carried blocker, it states whether closure is possible by read-only evidence, requires an Owner decision, requires out-of-band source recovery, or remains a write-gated future act — and what exact evidence/decision each needs.

Engineering PASS ≠ authority PASS. A PASS means the closure map is complete on paper. It does not close any criterion or blocker. Default disposition: HOLD.

Pipeline position (downstream-only). Deliverable 2 of the Mega Gate Bundle; it sharpens Deliverable B's aggregate No-Go (carried) into a closure-route map. It opens no package and verifies nothing.

Non-authorization (explicit). As Deliverable 1 §0 (no DB write/DDL/DML; no runtime mutation; no inspect/certified writes; no gate flip; no owner assignment; no contract promotion; no pg_cron/queue enable; no source/prior-report patch; no current/staging corpus; no TD; no implementation; no blocker resolved; no channel selected; v0.1/FIX7 V3 not overwritten; v0.2 not authority). No blocker is marked resolved here.

Evidence basis — INHERITED_EVIDENCE. No runtime queried. Facts inherited from accepted read-only reports. AgentData metadata authoritative at read time. CAV-3/CAV-4/CAV-5 carried.

Reading discipline (Codex caveat, honored). All sources read directly from AgentData KB, bounded/sequential, by the main process — no parallel/background reader-agents, no sub-agents, no local-prose inference. /tmp = decode-scratch only, never SSOT.


1. Purpose

Answer the macro's first two questions precisely: (1) what exact evidence remains before actual B2 TD can be opened, and (2) which No-Go items can be closed by read-only evidence vs. which remain Owner decisions. The packet answers:

  1. Per criterion: what closes it? — §5 closure matrix.
  2. Which closures are write-free (read-only evidence)? — §5 column.
  3. Which require an Owner decision or out-of-band recovery? — §5 column.
  4. Which remain write-gated regardless? — §5 + §6.
  5. What is the closure-route summary? — §5 summary.

The one rule, above all detail. Closure is routed, not performed. A "read-only-closeable" criterion still needs an Owner-gated read-only pass to actually close it; a "decision" criterion is the Owner's act; nothing here resolves anything.


2. Sources read

All 25 required sources read first-hand from AgentData KB, by the main process, sequentially; none SOURCE_NOT_READ (full list in Deliverable 20 §2). Used principally: Deliverable B (the G-1…G-11 Go/No-Go criteria + PO-1…9); R2 readiness scope + R2a (the runtime facts a read-only pass would re-confirm); Phase-1B (the blocker bundle); the interface packet (S3/S4/S7/S8); operating-rules (fail-closed; read-only inventory rule).


3. Accepted baseline (carried, not re-derived)

The Go/No-Go criteria (Deliverable B §14), carried verbatim in substance:

# Criterion Status today
G-1 B2 13-field contract frozen and accepted Go
G-2 B3 inspect_* stud stable (runtime-reconfirmed) + B4 consumer re-verified Partial
G-3 Điều 0-G rule-set recovered to an authoritative source (or Owner-accepted with caveat) No-Go
G-4 A channel selected from candidates + liveness/observability proven No-Go
G-5 Birth-producer governance owner (S2) assigned No-Go
G-6 Disposable staging/kho-tạm surface exists No-Go
G-7 S7 evidence contract honored + writers scoped (records-not-decides) Partial
G-8 Per-run S8 rollback unit + Điều 39 snapshot + downstream-certify handling defined; HOLD-2 acknowledged Partial
G-9 §8/BAD bad-input matrix committed to become runtime tests Partial
G-10 B7 holds warn-mode; transient GUC confirmed out-of-band Partial
G-11 CONS-002/003 + CELL-003/004/007 + Đ0-G recovery confirmed as prerequisites to downstream canonical materialization No-Go

Aggregate: NO-GO (1 Go, 5 No-Go, 5 Partial). Carried unchanged.


4. Analysis — closure routes

Each open criterion closes by exactly one of four route-types. Distinguishing them is the point of this packet:

  • R/O — Read-only evidence (write-free). A future Owner-gated read-only pass (catalog reads, DB-captured snapshots) can move a Partial to Go by converting INHERITED_EVIDENCE into current evidence. Bounded by the tool-boundary caveats (no crontab -l/systemctl/docker exec; /opt/incomex/dot/bin + env unreadable; logs tail-only; transient GUC unreadable — CAV-3/CAV-4/CAV-5).
  • DEC — Owner decision. Only the Owner can take the act (select a channel; assign an owner; accept a working source with caveat).
  • OOB — Out-of-band recovery. Owner-controlled, external to the inspected substrate (Điều 0-G source recovery, external S6).
  • WG — Write-gated build. Closure requires building/writing something (staging surface; S7 writers; a runtime fail-closed test) — forbidden now, Owner-gated later.

A criterion may need more than one route (e.g. the channel needs DEC to select and R/O to prove liveness). The matrix records the gating route(s).


5. No-Go / Partial closure matrix

"Read-only-closeable?" = can a future Owner-gated read-only pass close it without any write. "Exact evidence / decision needed" is what that step would have to produce. Nothing is closed here.

Criterion / blocker Today Closure route(s) Read-only-closeable? Exact evidence / decision needed Remains an Owner decision / write-gated?
G-1 contract frozen Go (already Go) n/a No
G-2 B3 stud + B4 consumer Partial R/O Yes A read-only re-confirm of the three inspect_* column types/order (information_schema) + that fn_birth_auto_certify fires only when all three present and only reads them (catalog/pg_proc). No — closes by read-only evidence
G-3 Điều 0-G authoritative No-Go OOB (+ optional DEC) No Either (a) the Đ0-G PEN/STAMP/GATE rule-set recovered to an authoritative source via external S6, or (b) an explicit Owner decision to accept the architecture/ working source as the TD basis with the caveat recorded. Yes — out-of-band recovery and/or Owner acceptance
G-4 channel selected + live No-Go DEC + R/O Partly DEC: Owner selects a candidate (host cron / agent-api executor). R/O: prove liveness for the chosen channel (host-cron entry present in wf_host_crontab_snapshot; or agent-api contract bound + master-switch state read). The selection is not read-only-closeable; the liveness proof is. Yes — selection is an Owner decision (Deliverable 4/5/6)
G-5 S2 owner assigned No-Go DEC (→ WG to write) No Owner assigns the birth-producer governance owner via Điều 37 → Điều 32; governance_object_ownership=0 today. The decision is the Owner's; writing it is a separate write gate. Yes — Owner decision then write-gated
G-6 staging surface exists No-Go WG No A built, isolated, disposable staging surface (Deliverable 11/12/13 define readiness; the build is future TD). Yes — write-gated build (no schema/corpus now)
G-7 S7 contract + writers Partial R/O (contract) + WG (writers) Partly R/O: confirm the S7 contract shape + that kg_quality_log/audit-queue are append-only/records-not-decides. WG: the S7 writers are a future build. Yes — writers write-gated (Deliverable 16)
G-8 S8 unit + downstream-certify Partial R/O (carried facts) + DEC/WG (mechanism) Partly R/O: re-confirm fn_iu_enact atomic/fail-closed/post-verify pattern + that all-three-inspect_* triggers B4. The rollback mechanism and the downstream-certify unwind are FUTURE_TECHNICAL_DESIGN + HOLD-2 (open). Yes — mechanism write-gated (Deliverable 17)
G-9 bad-input → runtime tests Partial WG (needs built producer + staging) No The producer must exist to run BAD-1…BAD-15; the plan (Deliverable D / Deliverable 14) is committed but not runnable. Yes — needs a built producer (write-gated)
G-10 B7 warn-mode + GUC Partial R/O (persisted) + OOB (transient) Partly R/O: persisted GUC layer is empty (pg_settings app.%=0, pg_db_role_setting=0) — confirmable read-only. OOB: the transient session value is unreadable (CAV-5) — needs an out-of-band Owner check. B7 stays warn-mode regardless (it is a separate block, not opened). Yes — transient GUC is out-of-band
G-11 CONS/CELL + Đ0-G prereqs No-Go DEC/WG (CONS/CELL) + OOB (Đ0-G) No CONS-002/003 + CELL-003/004/007 are open structural blockers (resolution is a separate Owner-gated workstream); Đ0-G recovery is OOB. B2 itself never canonicalizes, so this gates downstream materialization, not B2's inspect_* writes. Yes — separate Owner-gated workstreams

Carried blockers (not B2 Go/No-Go criteria, but gating context — all OPEN):

Blocker Closure route Read-only-closeable? Note
HOLD-2 (no atomic birth-certify promote txn) WG No No channel/decision closes it; surfaced in G-8 (Deliverable 17).
HOLD-1 (iu_staging_* pilot) WG No Separate R5 workstream; not in B2's path.
RISK-BYPASS (residue + warn-mode + latent kill-switch) DEC/WG Partly (residue is read-only-scopeable) Separate R4 workstream; disposition never auto-revert.
Điều 39 runtime-EMPTY (2199 edges / 0 provenance) WG No R1-K lane; cross-checked in Deliverable 18; B2 must not touch it.
Điều 35 production-readiness FAIL WG No R3 workstream; carried with any DOT-governance reuse.
CONS-002/003, CELL-003/004/007, GOV-016/017, GOV-REUSE-001 DEC/WG No Structural; gate materialization (G-11).

Closure-route summary.

  • Closeable by read-only evidence (write-free, but still Owner-gated to run): G-2 fully; G-7/G-8/G-10 partly (the contract/persisted/carried-fact halves). This is exactly the scope of the recommended Option E read-only re-verification (Deliverable 1).
  • Owner decisions: G-4 (channel selection), G-5 (owner assignment), G-3 (accept working source, if not recovered).
  • Out-of-band recovery: G-3 (Điều 0-G), G-10 (transient GUC).
  • Write-gated builds: G-6 (staging), G-7 (S7 writers), G-8 (rollback mechanism), G-9 (runtime tests, needs producer), G-11 (CONS/CELL materialization prerequisites).

No criterion is closeable purely by this packet; none is closed. Even the read-only-closeable ones require a separately Owner-authorized read-only pass to actually close (the same class of act as Phase-1).


6. Owner-gated future work

Future work Gate required Forbidden now?
Run the read-only re-verification pass that would close G-2 (and parts of G-7/G-8/G-10) Owner authorization to open a read-only pass Yes
Select the channel (closes G-4 selection half) Owner decision (Deliverable 4/5/6) Yes
Assign the S2 producer owner (closes G-5) Điều 37 → Điều 32 Yes
Recover the Điều 0-G source (closes G-3) external S6 — Owner out-of-band Yes
Confirm the transient GUC out-of-band (closes G-10 transient half) Owner out-of-band — read-only, not a runtime write Yes
Build staging (closes G-6) / S7 writers (G-7) / rollback mechanism (G-8) Điều 32 — write-gated Yes
Resolve CONS/CELL (closes G-11 prerequisites) separate Owner-gated workstream Yes

7. What remains unresolved

  • Nothing is closed; aggregate B2 TD remains NO-GO. This packet routes closures; it performs none.
  • The read-only-closeable set still needs an Owner-gated read-only pass to actually close — closure is not automatic and not done here.
  • G-3 / G-10 transient depend on out-of-band acts (Điều 0-G recovery; transient GUC) this lane cannot perform (CAV-5; external S6).
  • Blockers — all OPEN, none resolved: CONS-002, CONS-003, CELL-003/004/007, HOLD-1, HOLD-2, RISK-BYPASS, GOV-016/017, GOV-REUSE-001, Điều 39 runtime-EMPTY, Điều 35 production-readiness FAIL.
  • FUTURE_TECHNICAL_DESIGN_REQUIRED (NOT written here): the read-only pass's queries, the staging build, the S7 writers, the rollback mechanism, the runtime tests.

8. Ready for GPT/Codex review

Yes — as a design-only closure-route map, not a closure.

Core rule, kept above all detail: the path to actual B2 TD has a small read-only-closeable set (G-2 + parts of G-7/G-8/G-10), a small Owner-decision set (G-4/G-5/G-3), an out-of-band set (G-3/G-10-transient), and a write-gated set (G-6/G-7/G-8/G-9/G-11). None is closed here; the read-only-closeable ones still need an Owner-gated read-only pass.

Default disposition: HOLD. Engineering PASS = a complete closure map; it is not an Owner authorization to close anything. No PASS authorizes writes. All blockers remain OPEN.

Back to Knowledge Hub knowledge/dev/laws-new/newlaws/consolidation/mega-gate-no-go-closure-matrix-r2-b2-2026-06-18.md