KB-4A4E

Macro-5 Handoff to Next Claude Session — R2-B2 (2026-06-19)

3 min read Revision 1
laws-newR2-B2macro-5handoffsession-continuitynon-authorizing2026-06-19

Macro-5 Handoff to Next Claude Session — R2-B2 (2026-06-19)

Date: 2026-06-19 · Workstream: R2-B2-MACRO-5-STAGING-BUILD-AUTHORIZATION-PACKAGE-2026-06-19 (Deliverable 99 of 110) · Editorial revision: rev1 Class: handoff to next Claude session · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.

Metadata convention. Editorial revision (rev1) only. AgentData storage revision/content_length authoritative at read time.


0. Status and non-authorization

STATUS: PASS — engineering / design-only. What the next session needs to continue safely. Engineering PASS ≠ authority PASS. Default: HOLD.

1. Purpose

Hand the next Claude session the state, the locks, and the next legitimate step.

2. Sources / evidence read

Macro-4 handoff to next Claude session (D-lineage); this package's locks and registers; FRESH 2026-06-19 checks. Main process, no reader-agents.

3. Accepted baseline (carried)

The chain: TD-prep → Pilot Slice 0 → Mega Gate → read-only evidence → Macro-2 → Macro-3 (Option D) → Macro-4 (workbench/IO/gates) → Macro-5 (this: staging build authorization package).

4. Evidence / analysis — state for the next session

Item State
Macro-5 110 files written, engineering PASS, default HOLD
next legitimate step GPT review → Codex → Owner ballots
build NO-GO (SB gate); never start without Owner authority-PASS
actual B2 TD NO-GO (entry gate v2); not in Macro-6 scope
FRESH baseline births 1,213,295/1,402/1,211,893; ownership 0; edges 2,199/0; pg_cron absent
blockers all OPEN
tool lock v0.1 not overwritten; v0.2 not promoted

5. Candidate / requirement / gate / result

The next session must not build, run, or open TD without an Owner authority-PASS. The safe default is HOLD; the only automatic action is read-only re-verification if asked.

6. Owner-gated future work

All write-enabled steps remain Owner-gated.

7. What remains unresolved

Channel/S2/Điều 0-G undecided; SB gate + TD gate NO-GO.

8. Ready for GPT/Codex review

Yes — Codex should confirm the handoff carries the locks intact.

Back to Knowledge Hub knowledge/dev/laws-new/newlaws/consolidation/macro5-handoff-to-next-claude-session-2026-06-19.md