Macro-5 Do-Not-Implement Register — R2-B2 (2026-06-19)
Macro-5 Do-Not-Implement Register — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-5-STAGING-BUILD-AUTHORIZATION-PACKAGE-2026-06-19 (Deliverable 109 of 110) · Editorial revision: rev1
Class: do-not-implement register · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.
Metadata convention. Editorial revision (rev1) only. AgentData storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / design-only. The list of things designed here that must NOT be implemented. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Freeze implementation as a forbidden act across the whole package.
2. Sources / evidence read
Macro-4 do-not-implement register (D82); do-not-execute-build register (84); authority-pass-required-before-build (82). Main process, no reader-agents.
3. Accepted baseline (carried)
Implementation requires, in order: design-only readiness (this) → GPT → Codex → Owner authority-PASS → rollback plan → runtime-verification plan.
4. Evidence / analysis — do-not-implement list
| Designed here (do NOT implement) |
|---|
| the staging build authorization (do not authorize/build) |
| the non-executable staging TD candidate (do not turn into executable TD) |
| the staging object model (do not create objects) |
| the B2 candidate contracts (do not bind to runtime) |
| the preflight/postflight proof plans (do not run) |
| the delete-fast / no-production-touch packages (do not execute) |
| the bad-input later-test gate (do not test) |
| the Macro-6 branch (do not launch) |
5. Candidate / requirement / gate / result
Reading any deliverable as an implementation step is drift → HOLD. None of the later-chain steps is reached (no GPT/Codex/Owner/rollback/runtime-verification). Implementation before an Owner authority-PASS = FAIL.
6. Owner-gated future work
Every item is a future Owner-gated act; none is opened here.
7. What remains unresolved
All implementation remains forbidden; default HOLD.
8. Ready for GPT/Codex review
Yes — Codex should confirm nothing is implemented and no later-chain step is reached.