Macro-5 Build Preflight Master Checklist — R2-B2 (2026-06-19)
Macro-5 Build Preflight Master Checklist — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-5-STAGING-BUILD-AUTHORIZATION-PACKAGE-2026-06-19 (Deliverable 41 of 110) · Editorial revision: rev1
Class: build preflight master checklist · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.
Metadata convention. Editorial revision (rev1) only. AgentData storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / design-only. The master list of proof a future build must capture before it starts. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Answer macro question 4 (preflight half) — what proof is required before a future build?
2. Sources / evidence read
Macro-4 no-production-touch master proof plan (D43); entry gate v2 (D55); FRESH 2026-06-19 read-only checks. Main process, no reader-agents.
3. Accepted baseline (carried)
A build may begin only after an Owner authority-PASS and a captured baseline; the baseline is the FRESH read-only snapshot.
4. Evidence / analysis — preflight checklist (PF)
| # | Preflight check | Deliverable |
|---|---|---|
| PF-1 | source snapshot captured | 42 |
| PF-2 | runtime snapshot captured | 43 |
| PF-3 | production counts captured (must be unchanged) | 44 |
| PF-4 | forbidden surfaces listed | 45 |
| PF-5 | Owner build-approval present | 46 |
| PF-6 | channel check (GATE-4) | 47 |
| PF-7 | S2 owner check (GATE-5) | 48 |
| PF-8 | Điều 0-G check (GATE-3) | 49 |
| PF-9 | final go/no-go computed | 50 |
5. Candidate / requirement / gate / result
All nine are obligations; none is run here. PF-5/6/7/8 are currently No-Go/absent, so the preflight cannot pass today. The checklist is the shape of a future proof, not a proof.
6. Owner-gated future work
Running the preflight is part of a build; Owner-gated; forbidden now.
7. What remains unresolved
PF-5/6/7/8 unsatisfied; preflight cannot pass.
8. Ready for GPT/Codex review
Yes — Codex should confirm the checklist is an obligation set, not an executed proof.