Macro-5 Build Preflight Final Go/No-Go — R2-B2 (2026-06-19)
Macro-5 Build Preflight Final Go/No-Go — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-5-STAGING-BUILD-AUTHORIZATION-PACKAGE-2026-06-19 (Deliverable 50 of 110) · Editorial revision: rev1
Class: build preflight final go/no-go · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.
Metadata convention. Editorial revision (rev1) only. AgentData storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / design-only. Computes the aggregate preflight verdict from PF-1…PF-9. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Roll the preflight checks into a single, honest go/no-go.
2. Sources / evidence read
Preflight checklist (41) + checks (42–49); staging build gate (Macro-4 D57); entry gate v2 (D55). Main process, no reader-agents.
3. Accepted baseline (carried)
A build is eligible only if every preflight check passes and an Owner authority-PASS exists.
4. Evidence / analysis — aggregate preflight
| Check | Verdict |
|---|---|
| PF-1 source snapshot | obligation defined (not run) |
| PF-2 runtime snapshot | obligation defined (FRESH baseline captured read-only) |
| PF-3 production counts | obligation defined (FRESH baseline captured read-only) |
| PF-4 forbidden surfaces | listed |
| PF-5 Owner build-approval | No-Go (absent) |
| PF-6 channel (GATE-4) | No-Go |
| PF-7 S2 owner (GATE-5) | No-Go |
| PF-8 Điều 0-G (GATE-3) | No-Go |
| PF-9 final | NO-GO |
5. Candidate / requirement / gate / result
Aggregate preflight: NO-GO. Four hard checks (PF-5/6/7/8) are No-Go; the build cannot start. This mirrors the SB gate (NO-GO) and the entry gate v2 (NO-GO). No build is authorized.
6. Owner-gated future work
Clearing PF-5/6/7/8 is a set of Owner acts; forbidden now.
7. What remains unresolved
PF-5/6/7/8 No-Go; aggregate NO-GO.
8. Ready for GPT/Codex review
Yes — Codex should confirm the aggregate is honestly NO-GO.