Macro-5 Build Preflight Final Go/No-Go — R2-B2 (2026-06-19)

3 min read Revision 1
laws-newR2-B2macro-5build-preflightfinal-go-no-gono-gonon-authorizing2026-06-19

Macro-5 Build Preflight Final Go/No-Go — R2-B2 (2026-06-19)

Date: 2026-06-19 · Workstream: R2-B2-MACRO-5-STAGING-BUILD-AUTHORIZATION-PACKAGE-2026-06-19 (Deliverable 50 of 110) · Editorial revision: rev1 Class: build preflight final go/no-go · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.

Metadata convention. Editorial revision (rev1) only. AgentData storage revision/content_length authoritative at read time.


0. Status and non-authorization

STATUS: PASS — engineering / design-only. Computes the aggregate preflight verdict from PF-1…PF-9. Engineering PASS ≠ authority PASS. Default: HOLD.

1. Purpose

Roll the preflight checks into a single, honest go/no-go.

2. Sources / evidence read

Preflight checklist (41) + checks (42–49); staging build gate (Macro-4 D57); entry gate v2 (D55). Main process, no reader-agents.

3. Accepted baseline (carried)

A build is eligible only if every preflight check passes and an Owner authority-PASS exists.

4. Evidence / analysis — aggregate preflight

Check Verdict
PF-1 source snapshot obligation defined (not run)
PF-2 runtime snapshot obligation defined (FRESH baseline captured read-only)
PF-3 production counts obligation defined (FRESH baseline captured read-only)
PF-4 forbidden surfaces listed
PF-5 Owner build-approval No-Go (absent)
PF-6 channel (GATE-4) No-Go
PF-7 S2 owner (GATE-5) No-Go
PF-8 Điều 0-G (GATE-3) No-Go
PF-9 final NO-GO

5. Candidate / requirement / gate / result

Aggregate preflight: NO-GO. Four hard checks (PF-5/6/7/8) are No-Go; the build cannot start. This mirrors the SB gate (NO-GO) and the entry gate v2 (NO-GO). No build is authorized.

6. Owner-gated future work

Clearing PF-5/6/7/8 is a set of Owner acts; forbidden now.

7. What remains unresolved

PF-5/6/7/8 No-Go; aggregate NO-GO.

8. Ready for GPT/Codex review

Yes — Codex should confirm the aggregate is honestly NO-GO.