Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 57 of 90) · Editorial revision: rev1 Class: staging build authorization gate · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · STAGING_BUILD_REQUIRED_BUT_FORBIDDEN guard · NO write performed.

Metadata convention. Editorial revision (rev1) only. Storage revision/content_length authoritative at read time.


0. Status and non-authorization

STATUS: PASS — engineering / design-only. The separate gate that must be Go before a staging workbench may be built (distinct from the actual-TD gate). Engineering PASS ≠ authority PASS. Default: HOLD.

1. Purpose

Answer macro question 9 — what must be true before a staging build can be authorized? — as its own gate.

2. Sources / evidence read

Workbench concept (6) + build-not-authorized lock (12); delete-fast/no-touch requirements (10/11/37/43); TD-readiness §11. Main process, no reader-agents.

3. Accepted baseline (carried)

Building staging is FUTURE_TECHNICAL_DESIGN_REQUIRED + Owner-gated; the staging IO contract is defined (design-only), not built.

4. Evidence / analysis — staging build gate (SB)

# Criterion Status today
SB-1 Workbench concept + boundary + lifecycle accepted (by GPT/Codex/Owner) Partial (designed here; review pending)
SB-2 Delete-fast requirements + evidence shape accepted Partial (designed; not proven)
SB-3 No-production-touch proof plan accepted Partial (designed; not run)
SB-4 Naming/isolation convention chosen (separate from FRESH iu_core/unit_edit_draft) No-Go (properties only; no scheme chosen)
SB-5 An Owner authorizes a build (separate from TD authorization) No-Go (not given)
SB-6 A delete-fast + no-touch verification harness is designed No-Go (future TD)

5. Contract / requirement / matrix / result

Aggregate: NO-GO. A staging build is not authorized. Even a staging build (which is less than actual TD) requires its own Owner gate and is forbidden now. Building staging now = STAGING_BUILD_REQUIRED_BUT_FORBIDDEN → HOLD.

6. Owner-gated future work

Authorizing + executing a staging build is an Owner act; forbidden now.

7. What remains unresolved

SB-4/5/6 No-Go; SB-1/2/3 Partial; no build authorized.

8. Ready for GPT/Codex review

Yes — Codex should confirm the staging-build gate is separate from the TD gate and is NO-GO.

Back to Knowledge Hub knowledge/dev/laws-new/newlaws/consolidation/macro4-staging-build-authorization-gate-2026-06-19.md