Macro-4 Risk Register — R2-B2 (2026-06-19)
Macro-4 Risk Register — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 4 of 90) · Editorial revision: rev1
Class: risk register · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / design-readiness. The risks Macro-4 itself must guard against, with the drift token + stop disposition for each. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Name every way this macro could drift out of design-only and the lock that prevents it.
2. Sources / evidence read
Prompt §4–§6 (forbidden / contingency / safety locks); Macro-3 risk maps (bad-input fail-open, no-production-touch, delete-fast); inspect-producer §8/§15. Main process, no reader-agents.
3. Accepted baseline (carried)
A design-readiness macro can prepare and define contracts; it cannot build, write schema/corpus, open TD, or implement.
4. Evidence / analysis — risk matrix
| # | Risk | Drift token | Disposition |
|---|---|---|---|
| RK-1 | Actual TD content appears (schema/DDL/function body/wiring) | ACTUAL_TD_DRIFT |
HOLD |
| RK-2 | A staging schema/table/corpus is created | STAGING_BUILD_REQUIRED_BUT_FORBIDDEN / STAGING_TD_DRIFT |
HOLD |
| RK-3 | IO contract becomes a mega-registry / shared mutable write surface | IO_CONTRACT_OVERREACH |
HOLD |
| RK-4 | Channel treated as runtime authority | CHANNEL_AUTHORITY_DRIFT |
HOLD |
| RK-5 | S2 owner assigned / ownership row written | OWNER_ASSIGNMENT_DRIFT |
HOLD |
| RK-6 | Điều 0-G source adopted / recovered / patched | SOURCE_ADOPTION_DRIFT |
HOLD |
| RK-7 | Bad-input test executed | BAD_INPUT_TEST_RUN_DRIFT |
HOLD |
| RK-8 | B5/B7 opened as active workstream | B5_B7_SCOPE_CREEP |
HOLD |
| RK-9 | R1/KG opened as active workstream | R1_SCOPE_CREEP |
HOLD |
| RK-10 | Any DB write/DDL/DML; blocker falsely resolved | (FAIL conditions) | FAIL |
| RK-11 | v0.1/FIX7 V3 overwritten or v0.2 promoted | F8 / F9 | FAIL/HOLD |
| RK-12 | A deliverable not independently discardable | NOT_LEGO_COMPATIBLE |
HOLD |
5. Contract / requirement / matrix / result
Status this run: no drift token triggered. Each token has a dedicated guard deliverable (locks group 66–72; risk maps 43–54). Only KB consolidation docs were written; runtime was read-only.
6. Owner-gated future work
Any action a token guards against is Owner-gated; forbidden now.
7. What remains unresolved
Risks are guarded, not eliminated — they re-arm for every future macro and for the eventual build.
8. Ready for GPT/Codex review
Yes — Codex should add any drift mode this register omits.