KB-40B7

Macro-4 Owner One-Page Summary — R2-B2 (2026-06-19)

3 min read Revision 1
laws-newR2-B2macro-4ownerone-page-summarynon-authorizingowner-gated2026-06-19

Macro-4 Owner One-Page Summary — R2-B2 (2026-06-19)

Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 76 of 90) · Editorial revision: rev1 Class: owner one-page summary · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.

Metadata convention. Editorial revision (rev1) only. Storage revision/content_length authoritative at read time.


0. Status and non-authorization

STATUS: PASS — engineering / design-only. One page for the Owner: what Macro-4 did, what is decided, what is open. Engineering PASS ≠ authority PASS. Default: HOLD.

1. Purpose

Let the Owner decide in one read, without the 90-file detail.

2. Sources / evidence read

The full Macro-4 package; the Owner approval ballot (75). Main process, no reader-agents.

3. Accepted baseline (carried)

Macro-4 is design/readiness-only; it enacts nothing.

4. Evidence / analysis — for the Owner

  • What we built: a paper LEGO workbench for B2 — staging concept, IO contracts, delete-fast + no-production-touch obligations, a bad-input oracle, and refreshed gates. Nothing was built, written, or selected.
  • Where we stand (FRESH 2026-06-19): uncertified births 1,211,800 (growing); certified 1,402 (all 2026-03-21); governance_object_ownership 0; pg_cron absent; agent-api 0 birth-bound; KG edges 2,199/0-prov. The pipeline is still a producer that does not exist.
  • Two gates, both NO-GO: actual B2 TD (G-1…G-11) and staging build (SB-1…SB-6).
  • Three decisions still yours: channel (lean agent-api / host cron), S2 owner (dedicated role), Điều 0-G path (recover-first / accept-with-caveat).

5. Contract / requirement / matrix / result

Decide: accept Macro-4 (after Codex)? authorize a staging build? launch Macro-5 (M5-A staging build is the smallest next step)? Defaults all HOLD. No write follows automatically.

6. Owner-gated future work

The three lane decisions + the two build gates + any write are yours; forbidden until you approve.

7. What remains unresolved

Everything requiring a decision or a build; all blockers OPEN.

8. Ready for GPT/Codex review

Yes — this is the Owner's one-page entry; the ballot (75) records the decisions.