Macro-4 Next-Action Menu — R2-B2 (2026-06-19)
Macro-4 Next-Action Menu — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 84 of 90) · Editorial revision: rev1
Class: next-action menu · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / design-only. The menu of next actions, each with its gate. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Give the Owner/GPT a clear menu of what can happen next and what each requires.
2. Sources / evidence read
Macro-5 branch map (60); Owner ballot (75); handoff (77). Main process, no reader-agents.
3. Accepted baseline (carried)
No automatic TD; no write-enabled remediation; default HOLD.
4. Evidence / analysis — menu
| Option | What | Gate / precondition |
|---|---|---|
| A | GPT reviews 90 files | none (review of this package) |
| B | Codex adversarial review (MX-1…14) | GPT acceptance |
| C | Owner casts ballot M4-B1…B4 | Codex PASS_WITH_CAVEATS |
| D | Owner decides the three lanes (channel/S2/Điều 0-G) | Owner authority (Điều 37→32) |
| E | Launch Macro-5 = staging build authorization (M5-A) | Macro-4 accepted + Owner authorizes |
| F | Launch Macro-5 = actual B2 TD prep (M5-B) | three lanes decided + G-1…G-11 trending Go |
| REJECT | open B5/B7/R1 | refused → scope-creep guard |
5. Contract / requirement / matrix / result
Recommended path: A → B → C → (D) → E (M5-A staging build is the smallest forward step). Reject opening B5/B7/R1. Defaults HOLD; nothing launches automatically.
6. Owner-gated future work
Options C–F are Owner-gated; forbidden now.
7. What remains unresolved
No option beyond A/B is selected; defaults HOLD.
8. Ready for GPT/Codex review
Yes — Codex should confirm every option past review is Owner-gated.