KB-3607

Macro-4 Macro-5 Branch Map After Codex — R2-B2 (2026-06-19)

3 min read Revision 1
laws-newR2-B2macro-4macro-5branch-mapafter-codexnon-authorizing2026-06-19

Macro-4 Macro-5 Branch Map After Codex — R2-B2 (2026-06-19)

Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 60 of 90) · Editorial revision: rev1 Class: Macro-5 branch map · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.

Metadata convention. Editorial revision (rev1) only. Storage revision/content_length authoritative at read time.


0. Status and non-authorization

STATUS: PASS — engineering / design-only. The conditional branch plan for Macro-5; proposed, not launched. Engineering PASS ≠ authority PASS. Default: HOLD.

1. Purpose

Answer macro question 10 — what should Macro-5 do next? — as a conditional branch map after GPT/Codex review and Owner decisions.

2. Sources / evidence read

Macro-3 Macro-4 branch plan (B-A); staging-build vs actual-TD separation (59); entry gate v2 (55). Main process, no reader-agents.

3. Accepted baseline (carried)

Macro-5 may only be proposed; if Macro-4 passes GPT/Codex, Macro-5 = staging build authorization package or actual B2 TD gate package, still Owner-gated; no automatic launch.

4. Evidence / analysis — branch map

Branch Condition Macro-5 next action
M5-A staging build Macro-4 accepted + Owner authorizes a staging build (SB gate Go) prepare the staging build authorization package (still design→build-gated)
M5-B actual-TD prep the three Owner decisions made (channel + S2 + Điều 0-G) prepare the actual B2 TD entry package (design-only) once G-1…G-11 trend to Go
M5-C partial some decided, some HOLD prepare only the decided lane; keep others HOLD
M5-D hold Owner keeps HOLD re-verify read-only evidence; no new design surface
M5-E reject creep request for B5/B7/R1 work refuse → scope-creep guard

5. Contract / requirement / matrix / result

Recommended trigger: M5-A (staging build) is the smallest next step if the Owner wants forward motion, since the staging surface is the binding G-6 precondition for actual TD. No branch is launched here; all defaults HOLD.

6. Owner-gated future work

Launching any Macro-5 branch is Owner-gated; forbidden now.

7. What remains unresolved

Macro-5 not launched; trigger conditions unmet (no decisions, no build authorization).

8. Ready for GPT/Codex review

Yes — Codex should confirm even M5-A/M5-B stop at design/authorization, not implementation.

Back to Knowledge Hub knowledge/dev/laws-new/newlaws/consolidation/macro4-macro5-branch-map-after-codex-2026-06-19.md