Macro-4 Handoff to Next Claude Session — R2-B2 (2026-06-19)
Macro-4 Handoff to Next Claude Session — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 78 of 90) · Editorial revision: rev1
Class: session handoff · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / design-only. The continuity note for the next session. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Carry the state forward (OR §10 handoff): goal, result, paths, debts, blockers, next step.
2. Sources / evidence read
The Macro-4 package; operating-rules §10 (handoff). Main process, no reader-agents.
3. Accepted baseline (carried)
A handoff must list goal, achieved result, document paths, outstanding TD, blockers, next step.
4. Evidence / analysis — handoff
- Goal: prepare the B2 LEGO workbench layer (staging concept, IO contracts, delete-fast, no-production-touch, bad-input oracle, TD-entry/staging-build gates), design-only.
- Result: 90 files created under
newlaws/consolidation/macro4-*(89) +newlaws/reports/macro4-…-execution-report(1), all rev1. Nothing built/written/selected. - Method: sources read first-hand, main process, no reader-agents; oversized batches decoded via
/tmppython (scratch only); FRESH read-onlyquery_pg/list_docker. - Outstanding (future, Owner-gated): the three lane decisions; the staging build; actual B2 TD; producer build.
- Blockers: all OPEN (CONS-002/003, CELL-003/004/007, HOLD-1, HOLD-2, RISK-BYPASS, GOV-016/017, GOV-REUSE-001, Điều 39, Điều 35, GATE-3/4/5).
- Next step: GPT review → Codex → Owner ballot → branched Macro-5 (default HOLD).
5. Contract / requirement / matrix / result
A next session can resume from the package index (Deliverable 85) and the next-action menu (Deliverable 84). No state is mutated; the runtime evolves (backlog grows) so any future run must re-read FRESH evidence.
6. Owner-gated future work
All forward motion is Owner-gated; forbidden now.
7. What remains unresolved
All decisions/builds; all blockers OPEN.
8. Ready for GPT/Codex review
Yes — Codex should confirm the handoff is complete and accurate.