Macro-4 Executive Summary — R2-B2 (2026-06-19)
Macro-4 Executive Summary — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 2 of 90) · Editorial revision: rev1
Class: executive summary · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · DESIGN/READINESS-ONLY · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / design-readiness. The one-screen summary of the 90-file Macro-4 package. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Let a reviewer grasp Macro-4 in one read: what it prepares, what it refuses, and what stays open.
2. Sources / evidence read
The full Macro-4 deliverable set (Deliverables 1, 3–90); Macro-3 carried recommendations; FRESH runtime. Main process, no reader-agents.
3. Accepted baseline (carried)
Macro-3 accepted at decision-prep level; B-A design-only branch opened; recommendations carried as assumptions.
4. Evidence / analysis — what Macro-4 delivers
- Staging workbench (concept-only): a disposable, isolated, delete-fast draft surface mirroring the B3
inspect_*shape and Điều 0-G rules — never production. Not built. - IO contract envelope: a versioned per-block contract (input/output/error/evidence/rollback/owner/promotion/forbidden surfaces) — a contract, not a registry.
- B2 IO contracts: candidate-only
inspect_*output, fail-closed error contract, S7-shaped evidence, one-unit rollback/delete, owner-approval, production firewall. - Delete-fast + no-production-touch: one disposal unit; before/after production snapshot proof obligations.
- Bad-input oracle: invalid input must never create digest/PASS/stamp/certify; fail-open ⇒ REJECT. No test run.
- TD-entry gate v2 + staging-build gate: both aggregate NO-GO today.
5. Contract / requirement / matrix / result
Net result: the workbench layer is fully specified on paper and not built. Actual B2 TD = NO-GO; staging build = NOT authorized; channel not selected; S2 not assigned; Điều 0-G not adopted; all blockers OPEN.
6. Owner-gated future work
Building staging, opening B2 TD, and the three lane decisions are Owner-gated; forbidden now. Macro-5 is proposed, not launched.
7. What remains unresolved
Everything that requires an Owner decision or a build: the three lane decisions, the staging surface, the producer, all blockers.
8. Ready for GPT/Codex review
Yes — this is the fastest entry point; Codex begins from the review packet (Deliverable 73) and attack list (Deliverable 89).