Macro-4 B5/B7 Scope Lock — R2-B2 (2026-06-19)
Macro-4 B5/B7 Scope Lock — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 66 of 90) · Editorial revision: rev1
Class: B5/B7 scope lock · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · B5_B7_SCOPE_CREEP guard · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / design-only. Holds B5 (backlog) and B7 (gate/GUC policy) as dependency-only, not opened. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Guarantee Macro-4 does not open B5 or B7 as active workstreams.
2. Sources / evidence read
Macro-3 B5/B7 scope lock; inspect-producer §11 (manual one-shot = B5)/§5 (B7 separate); FRESH dot_config switches. Main process, no reader-agents.
3. Accepted baseline (carried)
B2 = inspect producer only. B5 = backlog pass (the 2026-03-21 one-shot belongs here, not B2). B7 = gate/GUC policy. Both are dependencies, referenced not redesigned.
4. Evidence / analysis
Macro-4 references B5 only to say "manual one-shot = B5 not B2" (channel/firewall) and B7 only to say the gate policy stays as-is (FRESH: app.birth_gate_mode warn-mode inherited; process/queue switches OFF; no warn→block flip). Neither is designed, opened, or modified. The 1.21M backlog is evidence/urgency, not a B5 work item opened here.
5. Contract / requirement / matrix / result — drift trigger (→ HOLD)
Any active design/implementation of B5 backlog draining or B7 gate-mode change = B5_B7_SCOPE_CREEP → HOLD. Status this run: NOT triggered.
6. Owner-gated future work
Opening B5 or B7 is a separate Owner-gated package; forbidden now.
7. What remains unresolved
B5/B7 remain unopened dependencies.
8. Ready for GPT/Codex review
Yes — Codex should scan for any B5/B7 active-workstream leakage.