KB-4F49

Macro-4 B2 Contract Completeness Checklist — R2-B2 (2026-06-19)

3 min read Revision 1
laws-newR2-B2macro-4b2completeness-checklistnon-authorizing2026-06-19

Macro-4 B2 Contract Completeness Checklist — R2-B2 (2026-06-19)

Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 36 of 90) · Editorial revision: rev1 Class: B2 contract completeness checklist · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.

Metadata convention. Editorial revision (rev1) only. Storage revision/content_length authoritative at read time.


0. Status and non-authorization

STATUS: PASS — engineering / design-only. Confirms B2's IO contract instantiates every envelope field. Engineering PASS ≠ authority PASS. Default: HOLD.

1. Purpose

Verify that B2's contract (Deliverables 29–35) covers the full envelope (Deliverable 19) with no gap.

2. Sources / evidence read

Deliverables 19, 29–35; inspect-producer §4 (13-field template); TD-readiness §6 (IO-contract readiness). Main process, no reader-agents.

3. Accepted baseline (carried)

A complete contract is a precondition (F-1 frozen) for TD; a missing field makes TD unverifiable.

4. Evidence / analysis — completeness matrix

Envelope field B2 deliverable Complete?
input_surface 29 yes
output_surface (candidate-only) 30 yes
error_surface 31 yes
evidence_surface 32 yes
rollback_surface / delete_fast_unit 33 yes
owner_surface / authority_gate 34 yes
forbidden_surfaces / production firewall 35 yes
promotion_surface 27 (envelope) + 18 (forbidden register) yes (forbidden now)
contract_id / version 19/20 shape only
no_production_touch_proof 43–48 yes (obligation)
bad_input_reject_rule 49–53 yes

5. Contract / requirement / matrix / result

B2's contract is complete in shape (F-1 frozen). Two fields remain Partial/open by design: source-authority (Điều 0-G, G-3 No-Go) and runtime B3/B4 re-confirmation (G-2 Partial). No field is bound to runtime here.

6. Owner-gated future work

Freezing and binding the full contract for TD is Owner-gated; forbidden now.

7. What remains unresolved

G-2 (B3/B4 runtime re-confirm) Partial; G-3 (Điều 0-G authority) No-Go.

8. Ready for GPT/Codex review

Yes — Codex should confirm no envelope field is missing from B2's contract.

Back to Knowledge Hub knowledge/dev/laws-new/newlaws/consolidation/macro4-b2-contract-completeness-checklist-2026-06-19.md