Macro-4 B2 Actual-TD Entry Gate v2 — R2-B2 (2026-06-19)
Macro-4 B2 Actual-TD Entry Gate v2 — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-4-STAGING-WORKBENCH-IO-CONTRACT-TD-ENTRY-GATE-2026-06-19 (Deliverable 55 of 90) · Editorial revision: rev1
Class: B2 actual-TD entry gate (v2) · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · ACTUAL_TD_DRIFT guard · NO actual TD · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / design-only. The refreshed Go/No-Go gate that must be all-Go before actual B2 technical design may start. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Answer macro question 8 — what must be true before actual B2 TD can open? — as a v2 of the TD-readiness G-1…G-11 gate, refreshed with FRESH 2026-06-19 evidence and the Macro-4 workbench layer.
2. Sources / evidence read
TD-readiness §14 (G-1…G-11); Macro-3 b2-td-still-no-go-check; FRESH runtime (this session); Macro-4 workbench + IO contract deliverables. Main process, no reader-agents.
3. Accepted baseline (carried)
The accepted gate: G-1 Go; G-3/4/5/6/11 No-Go; G-2/7/8/9/10 Partial → aggregate NO-GO. GATE-4 (channel) + GATE-5 (owner) non-waivable.
4. Evidence / analysis — entry gate v2 (FRESH 2026-06-19)
| # | Criterion | Maps to | Status (v2) |
|---|---|---|---|
| G-1 | B2 13-field contract frozen & accepted | F-1 | Go |
| G-2 | B3 stud runtime-reconfirmed + B4 re-verified | F-2/PO-5 | Partial (shape confirmed; FRESH birth_registry cols + 3 triggers/2 enabled; runtime B4 re-verify pending) |
| G-3 | Điều 0-G recovered to authoritative source (or Owner-accepted) | F-3/PO-1 | No-Go (working source; broken anchor) |
| G-4 | channel selected + liveness proven | F-4/PO-2/R2-D2 | No-Go (FRESH: pg_cron absent; host-cron 54/0-birth; agent-api 2/0-birth-bound; switches OFF) |
| G-5 | S2 owner assigned (Điều 37→32) | F-5/PO-3 | No-Go (FRESH governance_object_ownership=0) |
| G-6 | disposable staging surface exists | F-6/PO-9 | No-Go (workbench designed, not built) |
| G-7 | S7 contract honored + writers scoped | F-7 | Partial (FRESH event_outbox 215,609 undrained) |
| G-8 | per-run S8 unit + Đ39 snapshot + downstream-certify; HOLD-2 ack | F-8/PO-4 | Partial |
| G-9 | bad-input matrix committed to runtime tests | PO-6 | Partial (oracle defined; not runnable until built) |
| G-10 | B7 warn-mode holds; GUC out-of-band | PO-7/CAV-5 | Partial (GUC unreadable via query_pg) |
| G-11 | CONS/CELL + Đ0-G prereqs to canonical | PO-8 | No-Go (blockers OPEN) |
5. Contract / requirement / matrix / result
Aggregate verdict: NO-GO (5 No-Go, 5 Partial, 1 Go) — unchanged from the accepted gate; FRESH evidence confirms each No-Go/Partial. Entering actual B2 TD now would be ACTUAL_TD_DRIFT → HOLD. The earliest legitimate entry is after the Owner converts G-3/4/5/6/11 to Go.
6. Owner-gated future work
Converting any criterion to Go is an Owner act (source recovery, channel select, S2 assign, staging build, blocker resolution); forbidden now.
7. What remains unresolved
5 criteria No-Go, 5 Partial; aggregate NO-GO.
8. Ready for GPT/Codex review
Yes — Codex should verify no deliverable contains actual TD and the gate is honestly NO-GO.