KB-7695

Macro-3 Option-D Risk Register — R2-B2 (2026-06-19)

3 min read Revision 1
laws-newR2-B2macro-3option-drisk-registernon-authorizing2026-06-19

Macro-3 Option-D Risk Register — R2-B2 (2026-06-19)

Date: 2026-06-19 · Workstream: R2-B2-MACRO-3-OPTION-D-OWNER-DELEGATE-DECISION-PACKAGE-2026-06-19 (Deliverable 3 of 60) · Editorial revision: rev1 Class: risk register · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.

Metadata convention. Editorial revision (rev1) only. Storage revision/content_length authoritative at read time.


0. Status and non-authorization

STATUS: PASS — engineering / decision-prep. Enumerates the risks the Option-D package itself carries. Engineering PASS ≠ authority PASS. Default: HOLD.

1. Purpose

Make explicit the residual + process risks that survive even if the Owner accepts the recommendations.

2. Sources / evidence read

Macro-2 owner-path risk matrix, no-go reconfirmation, Codex review; FRESH 2026-06-19. Main process, no reader-agents.

3. Accepted baseline (carried)

Recommendation ≠ decision ≠ TD ≠ implementation; every drift has a named guard token.

4. Evidence / analysis

The dominant standing risk is not in this package but in the substrate: the backlog grows (+49 since Macro-2) while all gates stay closed — i.e. the cost of HOLD is real and accrues. This is recorded, not resolved.

5. Recommendation / matrix / result

# Risk Severity Guard / mitigation
R-1 Orchestration selection (Option D) read as enactment HIGH Orchestration-vs-authority lock (D1)
R-2 Channel recommendation read as selection HIGH CHANNEL_AUTHORITY_DRIFT guard (D14)
R-3 S2 role recommendation read as assignment HIGH OWNER_ASSIGNMENT_DRIFT guard (D21/D22)
R-4 Điều 0-G accept-with-caveat read as adoption HIGH SOURCE_ADOPTION_DRIFT guard (D30)
R-5 Bundling three lanes re-introduces coupling MED LEGO boundary map (D4); separate surfaces
R-6 Accept-with-caveat residual on STAMP/GATE under-weighted HIGH recorded HIGH + fail-closed (D26/D28)
R-7 Macro-4 drifts into implementation HIGH Macro-4 safety locks (D36)
R-8 Backlog growth during HOLD MED (accruing) recorded; Owner decision accelerates, not this macro
R-9 Documentary lag (KB vs runtime) LOW FRESH re-grounding (D54)

6. Owner-gated future work

Accepting any recommendation converts R-2…R-4 from "drift risk" into a real authority act requiring Điều 32 quorum.

7. What remains unresolved

All risks remain OPEN; none is mitigated to closed by this package.

8. Ready for GPT/Codex review

Yes — Codex should add any risk this register misses and challenge each severity.