Macro-3 Option-D Executive Summary — R2-B2 (2026-06-19)
Macro-3 Option-D Executive Summary — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-3-OPTION-D-OWNER-DELEGATE-DECISION-PACKAGE-2026-06-19 (Deliverable 2 of 60) · Editorial revision: rev1
Class: executive summary · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · RECOMMENDATION_ONLY — NOT AUTHORITY · NO write performed.
Metadata convention. Editorial revision (rev1) only. AgentData storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / decision-prep. One-page summary of the 60-file Option-D package. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Give GPT/Codex/Owner a one-screen orientation to the package before reading the 60 deliverables.
2. Sources / evidence read
The Macro-2 accepted bundle + FRESH 2026-06-19 read-only checks (see Deliverable 54 ledger). Main process, no reader-agents.
3. Accepted baseline (carried)
Option D selected by GPT (Owner-delegate); aggregate B2 TD = NO-GO; B2 = inspect producer only; B5/B7 dependency-only; R1/KG cross-check-only.
4. Evidence / analysis
The package converts Macro-2's three ballots (no winners) into three final recommendations, each on a separate LEGO control surface, plus a Macro-4 branch plan. Nothing is enacted. Fresh evidence confirms every premise (owner=0, agent-api up/0-birth-bound, host-cron 0-birth, pg_cron absent, backlog 1,211,736 and growing).
5. Recommendation / matrix / result
- Channel: two-track — agent-api (governance traceability) vs host cron (lowest blast radius); lean agent-api if forced; nothing selected.
- S2 owner: dedicated B2 Producer Owner role/class; single accountable owner + Điều 32 quorum; no self-approve; nobody assigned.
- Điều 0-G: recover-first preferred; accept-with-caveat fallback (HIGH residual, fail-closed); nothing adopted/patched.
- Macro-4: only after Owner approval, prepare staging readiness + actual-B2-TD entry gate; still no implementation.
6. Owner-gated future work
Three Owner decisions (channel / owner / source) + acceptance of the Macro-4 plan. All forbidden to enact now.
7. What remains unresolved
Everything material: all three lanes open, B2 TD NO-GO, all blockers OPEN, backlog untouched.
8. Ready for GPT/Codex review
Yes — start here, then read Deliverable 1 (decision record) and Deliverable 48 (owner ballot).