Macro-3 Final Non-Enacting Decision Package Index — R2-B2 (2026-06-19)
Macro-3 Final Non-Enacting Decision Package Index — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-3-OPTION-D-OWNER-DELEGATE-DECISION-PACKAGE-2026-06-19 (Deliverable 59 of 60) · Editorial revision: rev1
Class: package index · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / decision-prep. The map of all 60 deliverables. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
One index so any reviewer can navigate the package and confirm the count.
2. Sources / evidence read
All 60 deliverables. Main process, no reader-agents.
3. Accepted baseline (carried)
Exactly 60 files; 59 consolidation + 1 execution report (D60, under reports/).
4. Evidence / analysis — index by group
- Top layer (1–5): decision-record · exec-summary · risk-register · LEGO-boundary-map · non-authorization-register.
- Channel (6–15): final-rec · host-cron case · agent-api case · host-cron risk · agent-api risk · host-cron proof · agent-api proof · rejected-options · non-authority-lock · owner-question.
- S2 owner (16–23): final-rec · model-options · single-vs-committee · proof-plan · authority-path · non-assignment-lock · row-write-forbidden · owner-question.
- Điều 0-G (24–31): final-rec · recover-first case · accept-with-caveat case · defer case · stamp/gate-risk · source-authority-proof · non-adoption-lock · owner-question.
- Gate/Macro-4 (32–37): gate-impact-map · b2-td-still-no-go · staging-readiness · macro4-branch-plan · macro4-safety-locks · macro4-scale-plan.
- Locks (38–45): bad-input-fail-open · no-prod-touch · delete-fast · b5/b7-lock · r1/kg-lock · no-mega-pipeline · tool-packet-lock · engineering≠authority.
- Review/handoff (46–59): codex-packet · gpt-checklist · owner-ballot · owner-one-page · handoff-owner · handoff-session · blocker-status · do-not-implement · non-write-ledger · owner-delegate-rec-register · caveat-register · open-question-register · next-action-menu · this-index.
- Report (60): execution report (
reports/).
5. Recommendation / matrix / result
Count = 60 (D1–D59 consolidation + D60 report). All rev1.
6. Owner-gated future work
None here; navigation only.
7. What remains unresolved
Package complete; Owner decision pending.
8. Ready for GPT/Codex review
Yes — start at D2 (summary) or D49 (owner one-page).