Macro-3 Điều 0-G STAMP/GATE Risk Register (2026-06-19)

3 min read Revision 1
laws-newR2-B2macro-3dieu0gstamp-gaterisk-registernon-authorizing2026-06-19

Macro-3 Điều 0-G STAMP/GATE Risk Register (2026-06-19)

Date: 2026-06-19 · Workstream: R2-B2-MACRO-3-OPTION-D-OWNER-DELEGATE-DECISION-PACKAGE-2026-06-19 (Deliverable 28 of 60) · Editorial revision: rev1 Class: Điều 0-G STAMP/GATE risk register · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO write performed.

Metadata convention. Editorial revision (rev1) only. Storage revision/content_length authoritative at read time.


0. Status and non-authorization

STATUS: PASS — engineering / decision-prep. Records the HIGH residual the accept-with-caveat path (0G-B) would carry. Engineering PASS ≠ authority PASS. Default: HOLD.

1. Purpose

Make the STAMP/GATE residual explicit so 0G-B is never chosen blind.

2. Sources / evidence read

Macro-2 working-vs-authoritative packet, adoption-risk memo; inspect-producer TD-prep BI-5. Main process, no reader-agents.

3. Accepted baseline (carried)

PEN built (Phase A); STAMP and GATE rules were never built (Phase-B); the Constitution anchor law-00g-birth.md is broken.

4. Evidence / analysis — residual table

# Residual Severity Note
0G-RR-1 STAMP rules never built — producer has no authoritative STAMP spec HIGH must fail-closed on STAMP it cannot resolve
0G-RR-2 GATE rules never built — no authoritative GATE spec HIGH must fail-closed on GATE it cannot resolve
0G-RR-3 Broken anchor (law-00g-birth.md) — authority chain severed HIGH recover (0G-A) or waive-with-caveat (0G-B)
0G-RR-4 Accept-with-caveat could drift into silent adoption MED SOURCE_ADOPTION_DRIFT guard (D30)

5. Recommendation / matrix / result

If 0G-B is chosen, 0G-RR-1…RR-3 are tolerated only with the caveat recorded and the producer fail-closed on every unresolved STAMP/GATE rule. 0G-A removes RR-1…RR-3 at the root.

6. Owner-gated future work

Building STAMP/GATE rules or fixing the anchor are Owner-gated source acts; forbidden now.

7. What remains unresolved

All four residuals OPEN; STAMP/GATE unbuilt.

8. Ready for GPT/Codex review

Yes — Codex should confirm fail-closed truly neutralizes RR-1/RR-2 for a TD-basis use.