Macro-3 Điều 0-G Defer Final Case (2026-06-19)
Macro-3 Điều 0-G Defer Final Case (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-3-OPTION-D-OWNER-DELEGATE-DECISION-PACKAGE-2026-06-19 (Deliverable 27 of 60) · Editorial revision: rev1
Class: Điều 0-G case (0G-C) · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · SOURCE_ADOPTION_DRIFT guard · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / decision-prep. The case for defer. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Give the Owner the honest case for doing neither recovery nor waiver yet.
2. Sources / evidence read
Macro-2 owner decision ballot (0G-C), non-adoption register. Main process, no reader-agents.
3. Accepted baseline (carried)
0G-C = keep GATE-3 NO_GO; do not open Đ0-G-dependent TD; a safe holding pattern with no progress on the source.
4. Evidence / analysis
For 0G-C: (a) zero risk of premature adoption or a bad waiver; (b) appropriate if S6 is unreachable and the Owner is unwilling to carry the HIGH 0G-B residual. Against: it makes no progress; the Đ0-G-dependent slice of B2 TD stays blocked indefinitely. It is the correct default but a poor destination.
5. Recommendation / matrix / result
Recommend 0G-C as the safe default if neither 0G-A nor 0G-B is acceptable — equivalently, the standing HOLD. Not a progress path.
6. Owner-gated future work
Leaving 0G-C later requires choosing 0G-A or 0G-B; Owner-gated.
7. What remains unresolved
Source authority unrecovered; Đ0-G-dependent TD blocked.
8. Ready for GPT/Codex review
Yes — Codex should weigh defer's "no progress" against the accruing backlog cost.