Macro-3 Channel Owner-Approval Question — R2-B2 (2026-06-19)
Macro-3 Channel Owner-Approval Question — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-3-OPTION-D-OWNER-DELEGATE-DECISION-PACKAGE-2026-06-19 (Deliverable 15 of 60) · Editorial revision: rev1
Class: channel owner-approval question · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · OWNER_APPROVAL_REQUIRED · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / decision-prep. Poses the channel decision to the Owner; does not answer it. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Give the Owner one precise question whose answer is the channel decision.
2. Sources / evidence read
D6 final recommendation, D7–D13 cases/risks/proofs. Main process, no reader-agents.
3. Accepted baseline (carried)
The channel is internal to B2 and replaceable; the decision is a real open Owner gate (GATE-4).
4. Evidence / analysis
Recommendation lean: agent-api for governance traceability if forced; host cron if simplicity/blast-radius is the priority.
5. Recommendation / matrix / result — the question
CH-Q1: Which channel do you authorize as the (replaceable) B2 producer channel for the Macro-4 staging readiness work — (a) agent-api executor, (b) host cron, or (c) neither yet (HOLD)? Default if unanswered: (c) HOLD. Sub-questions: CH-Q1a do you prioritize observability/auditability (→a) or simplicity/blast-radius (→b)? · CH-Q1b do you authorize a DRY_RUN-only staging exercise of the chosen channel? (still staging, still no prod write).
6. Owner-gated future work
Answering CH-Q1 is the channel decision; recording it + any wiring are Owner acts, forbidden now.
7. What remains unresolved
CH-Q1 unanswered; channel not selected.
8. Ready for GPT/Codex review
Yes — Codex should confirm CH-Q1 is answerable from the package and carries a safe default.