Macro-3 Blocker Status After Option-D Package — R2-B2 (2026-06-19)
Macro-3 Blocker Status After Option-D Package — R2-B2 (2026-06-19)
Date: 2026-06-19 · Workstream: R2-B2-MACRO-3-OPTION-D-OWNER-DELEGATE-DECISION-PACKAGE-2026-06-19 (Deliverable 52 of 60) · Editorial revision: rev1
Class: blocker status · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO blocker resolved · NO write performed.
Metadata convention. Editorial revision (rev1) only. Storage revision/
content_lengthauthoritative at read time.
0. Status and non-authorization
STATUS: PASS — engineering / decision-prep. Confirms every blocker remains OPEN after this package. Engineering PASS ≠ authority PASS. Default: HOLD.
1. Purpose
Prevent any reading that the package resolved a blocker (it resolved none).
2. Sources / evidence read
Macro-2 blocker-status-after-owner-readiness; FRESH 2026-06-19. Main process, no reader-agents.
3. Accepted baseline (carried)
A decision-prep package cannot resolve a blocker; only an Owner-gated remediation can.
4. Evidence / analysis — blocker ledger (all OPEN)
| Blocker | Status |
|---|---|
| CONS-002 / CONS-003 | OPEN |
| CELL-003 / CELL-004 / CELL-007 | OPEN |
| HOLD-1 (staging→prod pilot) | OPEN |
| HOLD-2 (no atomic birth-certify-promote txn) | OPEN |
| RISK-BYPASS (warn-mode + latent kill-switch) | OPEN |
| GOV-016 / GOV-017 / GOV-REUSE-001 | OPEN |
| Điều 39 (universal_edges 2,199 / 0 prov, FRESH) | OPEN |
| Điều 35 (prod-readiness FAIL) | OPEN |
| GATE-3 (Điều 0-G) / GATE-4 (channel) / GATE-5 (owner) | OPEN |
5. Recommendation / matrix / result
No blocker resolved. Falsely resolving any = FAIL (F6). Status this run: not triggered.
6. Owner-gated future work
Each blocker is closed only by a separate Owner-gated workstream.
7. What remains unresolved
All of the above.
8. Ready for GPT/Codex review
Yes — Codex should confirm no deliverable claims a blocker closed.