KB-A8E3

Macro-2 Staging After-Owner-Decision Readiness Map — R2-B2 (2026-06-19)

4 min read Revision 1
laws-newR2-B2macro-2stagingreadiness-mapnon-authorizingowner-gated2026-06-19

Macro-2 Staging After-Owner-Decision Readiness Map — R2-B2

Date: 2026-06-19 · Workstream: R2-B2-MACRO-2-OWNER-DECISION-PREREQ-CLOSURE-READINESS-2026-06-19 (Deliverable 31 of 45) · Editorial revision: rev1 Class: staging sequencing/readiness map · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO staging built · NO write performed.

Metadata convention. Editorial revision (rev1) only. AgentData storage revision/content_length authoritative at read time; not pinned here.

Sequencing lock. Maps when staging readiness sequences relative to the Owner decisions (Path 5, after channel/Đ0-G/S2). It builds no staging and authorizes nothing.


0. Status and non-authorization

STATUS: PASS — engineering / decision-support. The staging sequencing map (after the three Owner decisions) + carried NT/DF obligations. It builds nothing.

Engineering PASS ≠ authority PASS. Default disposition: HOLD. No staging built; no schema/corpus; no DB write/DDL/DML; no TD; no blocker resolved; v0.1 not overwritten; v0.2 not authority.

Evidence basis — INHERITED_KB_EVIDENCE (NT-1…8, DF-1…6) + FRESH (no-touch baseline RQ-1). Reading discipline: main process, no reader-agents.


1. Purpose

Show the Owner where staging readiness fits (Path 5, after the channel/Đ0-G/S2 decisions) and what its proof obligations are — without building it.


2. Sources / evidence read

The 30-file staging no-touch + delete-fast rechecks (NT-1…8, DF-1…6); the Mega-Gate staging build readiness; Deliverable 28 (entry projection); the fresh RQ-ledger. Read directly, main process.


3. Accepted baseline (carried)

Sequence: the three Owner decisions (channel/Đ0-G/S2) → staging build readiness (Path 5) → a separate actual-B2-TD gate. Staging is channel-agnostic and most useful once contract inputs are frozen.


4. Staging readiness map (after the three decisions)

Step Precondition Staging contribution Still owed
Channel/Đ0-G/S2 decided the three Owner decisions inputs frozen → staging can mirror the real B3 shape the decisions themselves (Macro-2 prepares)
Staging build readiness (Path 5) inputs frozen + Owner authorizes Macro-3 disposable workshop; NT-1…8 (no-touch) + DF-1…6 (delete-fast) specifiable the build itself (write-gated, Macro-3+)
No-touch "before" baseline read-only captured FRESH 2026-06-19 (RQ-1: 1,402 cert / 1,211,687 uncert / 0 stamped) — the reference an "after" would compare to the "after" snapshot (needs a built pilot)
Actual B2 TD staging ready + gates closed a separate TD gate

Carried obligations (specifiable read-only; execution write-gated): NT-1…8 (production inspect_*/certified/canonical/identity/KG unchanged; containment; no silent PASS); DF-1…6 (one disposal unit, total, isolated; DF-3 totality disqualifying).

Reading. Staging readiness is fully specifiable read-only and a fresh no-touch baseline is captured; the build is sequenced after the three Owner decisions and remains write-gated (Macro-3+). Nothing is built here.


5. Result

Staging sequences after the Owner decisions (Path 5); its proofs are specifiable and a fresh baseline exists; the build stays write-gated. No staging built. OWNER_DECISION_REQUIRED.


6. Owner-gated future work

Authorizing Macro-3 / building staging / taking the "after" snapshot are Owner-gated; forbidden now.


7. What remains unresolved

  • Staging unbuilt; build sequenced after the decisions.
  • Blockers — all OPEN.

8. Ready for GPT/Codex review

Yes — as the staging readiness/sequencing map.

Core rule: staging sequences after channel/Đ0-G/S2; NT/DF specifiable; fresh no-touch baseline captured (RQ-1); build write-gated, nothing built.

Default disposition: HOLD. Engineering PASS ≠ authority PASS. All blockers remain OPEN.

Back to Knowledge Hub knowledge/dev/laws-new/newlaws/consolidation/macro2-staging-after-owner-decision-readiness-map-2026-06-19.md