Macro-2 S2 Owner Assignment Readiness — R2-B2 (2026-06-19)
Macro-2 S2 Owner Assignment Readiness — R2-B2
Date: 2026-06-19 · Workstream: R2-B2-MACRO-2-OWNER-DECISION-PREREQ-CLOSURE-READINESS-2026-06-19 (Deliverable 13 of 45) · Editorial revision: rev1
Class: S2 owner assignment readiness / decision-prep · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO owner assigned · NO write performed.
Metadata convention. Editorial revision (rev1) only. AgentData storage revision/
content_lengthauthoritative at read time; not pinned here.
Owner-assignment lock. This packet states what is needed to assign the S2 governance owner for the B2 producer lane. It assigns no owner.
OWNER_ASSIGNMENT_DRIFT→ HOLD.
0. Status and non-authorization
STATUS: PASS — engineering / decision-prep. The readiness picture for an S2 owner assignment: fresh ownership state, the authority path, and the checklist. It assigns no owner.
Engineering PASS ≠ authority PASS. Default disposition: HOLD. No owner assigned; no governance write; no DB write/DDL/DML; no TD; no blocker resolved; v0.1 not overwritten; v0.2 not authority.
Evidence basis — FRESH_READONLY_EVIDENCE (2026-06-19 RQ-15) + INHERITED_KB_EVIDENCE (Điều 32/37). Reading discipline: main process, no reader-agents.
1. Purpose
Answer macro question 4 — what exactly is needed for S2 owner assignment? — as a readiness picture, without assigning.
The one rule: S2 (the producer's governance owner — who runs B2) is assigned by the Owner via Điều 37 → Điều 32, never by this macro.
2. Sources / evidence read
The inspect-producer TD-prep (S2 = external owner; PO-3); the interface S-surface contract; the Điều 32 law (quorum/scope) + Điều 32 note; the Điều 35 note (DOT ownership); the fresh RQ-15 (governance_object_ownership). Read directly, main process.
3. Accepted baseline (carried)
B2's contract field 4: "Authority / Owner gate = S1 / Điều 32 to go standing; external S2 owner." G-5 = NO_GO_OWNER_DECISION. The producer must not run ungoverned (an ungoverned producer = fail-open).
4. Evidence / analysis (FRESH 2026-06-19)
governance_object_ownership= 0 rows (RQ-15) — fresh-confirmed today (was inherited in the 30-file macro; this closes that gap). No governance owner exists for the birth producer (or anything else) in that table.- The B2 producer lane therefore has no assigned owner; standing it up without one violates the hard floor (governed S2 owner is non-waivable, GATE-5).
- The authority path is Điều 37 (governance organization) → Điều 32 (approval): an assignment is a system-impacting change in Điều 32 §2.4 scope, requiring the risk-scaled quorum (§4.2).
5. Readiness checklist (what assignment needs — none satisfied here)
| # | Readiness item | Status today |
|---|---|---|
| RD-1 | A named candidate owner for the B2 producer lane | none (Deliverable 14 = candidate types, not a name) |
| RD-2 | The authority path confirmed (Điều 37 → Điều 32) | path known; not exercised |
| RD-3 | The Điều 32 risk level + quorum for the assignment decided | undecided |
| RD-4 | Evidence the candidate can govern the lane (accountability, audit) | not gathered |
| RD-5 | governance_object_ownership row created for the B2 producer |
absent (RQ-15 = 0); a future write |
| RD-6 | No self-approve / no Owner self-downgrade (Điều 32 §4.3) confirmed | constraint noted; not applied |
Result: S2 owner assignment is NOT ready and not performed; the readiness is fully specifiable but every item is Owner-gated. OWNER_DECISION_REQUIRED.
6. Owner-gated future work
| Future work | Gate | Forbidden now? |
|---|---|---|
| Assign the B2-producer governance owner | external S2 → Điều 37 → Điều 32 | Yes |
Create the governance_object_ownership row |
Điều 32 (write) | Yes |
7. What remains unresolved
- No owner assigned;
governance_object_ownership= 0 (FRESH). - Blockers — all OPEN.
8. Ready for GPT/Codex review
Yes — as an S2 assignment-readiness packet.
Core rule: S2 owner assignment needs a named candidate + Điều 37→32 quorum + a governance-ownership row (all Owner-gated); governance_object_ownership=0 FRESH-confirmed; no owner assigned.
Default disposition: HOLD. Engineering PASS ≠ authority PASS. All blockers remain OPEN.