KB-AF0A

Macro-2 GPT Review Checklist — R2-B2 (2026-06-19)

4 min read Revision 1
laws-newR2-B2macro-2gpt-review-checklistnon-authorizing2026-06-19

Macro-2 GPT Review Checklist — R2-B2

Date: 2026-06-19 · Workstream: R2-B2-MACRO-2-OWNER-DECISION-PREREQ-CLOSURE-READINESS-2026-06-19 (Deliverable 41 of 45) · Editorial revision: rev1 Class: GPT review checklist · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO verdict · NO write performed.

Metadata convention. Editorial revision (rev1) only. AgentData storage revision/content_length authoritative at read time; not pinned here.

Checklist lock. The checklist GPT applies before passing to Codex. It performs no verdict and authorizes nothing.


0. Status and non-authorization

STATUS: PASS — engineering / design-only. The GPT review checklist for the 45-file bundle. Engineering PASS ≠ authority PASS. Default disposition: HOLD. No verdict; no DB write/DDL/DML; no TD; no blocker resolved; v0.1 not overwritten; v0.2 not authority.

Evidence basis — design synthesis (macro §2 C1–C30, §7 SC1–SC20). Reading discipline: main process, no reader-agents.


1. Purpose

Give GPT the exact completion + non-authorization checks for the 45 files, mapped to the macro's C-criteria and self-checks.


2. Sources / evidence read

The macro §2 completion criteria (C1–C30); §7 self-check (SC1–SC20); Deliverables 40 (Codex packet), 45 (exec report). Read directly, main process.


3. GPT review checklist

# Check Where verified
1 Exactly 45 files at the exact paths (44 consolidation + 1 report) Deliverable 45 §1
2 All 45 re-read after writing Deliverable 45 §1
3 All required KB sources read directly, bounded/sequential, no reader-agents Deliverable 45 §2/§4
4 Fresh vs inherited vs unavailable evidence labeled Deliverable 45 §3
5 Tool/packet lock carried (v0.1 not overwritten; v0.2 not authority) Deliverable 45 §5
6 Owner ballot prepared but not decided (Q1: D rec) Deliverables 1–5
7 Channel ballot prepared; no channel selected Deliverables 6–12
8 S2 ballot prepared; no owner assigned Deliverables 13–18
9 Đ0-G ballot prepared; no source adopted Deliverables 19–24
10 Actual B2 TD still NO-GO; hard floor + waiver map intact Deliverables 25–28
11 No actual TD; no staging schema/corpus Deliverables 29–31
12 Bad-input proofs not run (producer MISSING) Deliverable 32
13 B5/B7 dependency-only; R1/KG cross-check-only; no mega-pipeline Deliverables 33–35
14 Macro-3 planned (45–50 / 30–40), not authorized; preconditions + locks Deliverables 36–37
15 Do-not-implement register complete; no decision made on Owner's behalf Deliverable 39
16 Codex review packet prepared (incl. fresh-SQL re-ground instruction) Deliverable 40
17 Blockers all OPEN (none resolved); closure routes only Deliverable 44
18 Engineering PASS distinguished from authority PASS in every §0 all 45
19 No drift triggered (TD/channel/owner/source/staging/B5-B7/R1/mega) Deliverables 11/16/23/29/30/33/34/35
20 Default HOLD; PASS ≠ Owner authorization all 45

If all pass: GPT forwards to Codex. If any fails: return for patch before Codex.


4. Result

A 20-point GPT checklist mapped to the macro criteria. GPT performs the verdict; this checklist prepares it. OWNER_DECISION_REQUIRED downstream.


5. Owner-gated future work

GPT review → Codex review → Owner decision; forbidden to this macro.


6. Owner-gated future work (writes)

None proposed; all writes remain Owner-gated.


7. What remains unresolved

  • GPT/Codex verdicts pending.
  • Blockers — all OPEN.

8. Ready for GPT/Codex review

Yes — as the GPT review checklist.

Core rule: 20 checks mapping completion + non-authorization; no verdict performed; no decision made.

Default disposition: HOLD. Engineering PASS ≠ authority PASS. All blockers remain OPEN.