KB-12AE

Macro-2 B2 Hard-Floor Reconfirmation — R2-B2 (2026-06-19)

4 min read Revision 1
laws-newR2-B2macro-2b2hard-floornon-waivablenon-authorizing2026-06-19

Macro-2 B2 Hard-Floor Reconfirmation — R2-B2

Date: 2026-06-19 · Workstream: R2-B2-MACRO-2-OWNER-DECISION-PREREQ-CLOSURE-READINESS-2026-06-19 (Deliverable 26 of 45) · Editorial revision: rev1 Class: B2 hard-floor reconfirmation · READ-ONLY · NON-ENACTING · NON-AUTHORIZING · NO waiver granted · NO write performed.

Metadata convention. Editorial revision (rev1) only. AgentData storage revision/content_length authoritative at read time; not pinned here.

Hard-floor lock. Reconfirms the B2 hard floor — the invariants no waiver can cross. It grants no waiver and authorizes nothing.


0. Status and non-authorization

STATUS: PASS — engineering / control. The B2 hard floor reconfirmed; it survives any waiver. No waiver granted.

Engineering PASS ≠ authority PASS. Default disposition: HOLD. No waiver; no TD; no DB write/DDL/DML; no blocker resolved; v0.1 not overwritten; v0.2 not authority.

Evidence basis — INHERITED_KB_EVIDENCE (waiver map hard floor; B2-AC-1…14) + FRESH (RQ-1/10). Reading discipline: main process, no reader-agents.


1. Purpose

Reaffirm what is non-negotiable for B2 regardless of which gates the Owner later waives — so no waiver (e.g. GATE-3) is read as relaxing fail-closure or block isolation.


2. Sources / evidence read

The owner waiver map (hard floor); the inspect-producer TD-prep (B2-AC-1…14); the interface anti-coupling; the fresh RQ-ledger. Read directly, main process.


3. Accepted baseline (carried)

A waiver trades readiness completeness for schedule, never fail-closure or block isolation. The hard floor survives any waiver.


4. B2 hard floor (non-waivable — reconfirmed)

# Hard-floor invariant Grounding Fresh check
HF-1 B2 must not certify / canonicalize / mint identity / write KG (B2-AC-1…4) C6; interface RQ-1 (B2 writes only inspect_*; canonical cols present-unused)
HF-2 No faked inspect_*=now() / no fused INSERT (B2-AC-5/6) R2a §7; C6 §12
HF-3 The channel must not leak into the contract (B2-AC-7) C6; Codex
HF-4 A per-run rollback unit must exist (B2-AC-9; S8) interface S8; HOLD-2 OPEN
HF-5 A governed S2 owner must exist (GATE-5 non-waivable) waiver map RQ-15 (governance_object_ownership=0)
HF-6 A staging workshop must exist (GATE-6) waiver map unbuilt
HF-7 No engineering PASS treated as Owner authorization (B2-AC-10) chain every §0
HF-8 v0.2-hardening not FIX7 authority (B2-AC-11) tool lock
HF-9 Fail-closed default: bad input ⇒ no stamp + audit (BI-1…12; "không chắc đúng = sai") C6 §8; OR §0.1 producer MISSING (RQ-10/11)

Reading. The hard floor is intact and survives any waiver the Owner might grant (including a GATE-3 Đ0-G waiver). Fresh evidence reconfirms the load-bearing facts (B2 writes no canonical; no producer; no owner). No waiver granted here.


5. Result

The B2 hard floor stands; GATE-4 (channel) + GATE-5 (owner) remain non-waivable; a GATE-3 waiver, if the Owner grants it, does not touch the hard floor. No waiver granted.


6. Owner-gated future work

Granting any waivable gate (with caveat) is the Owner's act; the hard floor is never waivable.


7. What remains unresolved

  • Hard floor intact; no waiver granted; HOLD-2 (HF-4) OPEN.
  • Blockers — all OPEN.

8. Ready for GPT/Codex review

Yes — as the B2 hard-floor reconfirmation.

Core rule: the hard floor (HF-1…HF-9) is non-waivable and survives any waiver; GATE-4/5 non-waivable; no waiver granted.

Default disposition: HOLD. Engineering PASS ≠ authority PASS. All blockers remain OPEN.

Back to Knowledge Hub knowledge/dev/laws-new/newlaws/consolidation/macro2-b2-hard-floor-reconfirmation-2026-06-19.md