KB-601D

Mission 2: DOT Pivot Tools Report

3 min read Revision 1
mission-2dieu-26dot-toolsreport

Mission 2: DOT Khai Báo Pivot — Report (Điều 26 v3.5)

Date: 2026-03-28 | PR: #641 | Status: MERGED + DEPLOYED


Step 0: Checkpoint Quotes

Operating Rules v5.x

v5.4 | 2026-03-28 — Mission 1 DONE (PR #640). pivot_count() LIVE. 30 triggers DISABLED. Mission 2 tiếp.

Merge Rule

CI GREEN = CHỈ 4 required checks GREEN: Pass Gate, Quality Gate, check-critical-files, Contract Schema Validation.

Verify Nuxt Rule

§0-AF: EVIDENCE bắt buộc từ production URL https://vps.incomexsaigoncorp.vn/api/...

Assembly Gate

# Question Answer
Q0 PostgreSQL ready? YES — pivot_definitions + pivot_count() LIVE from Mission 1
Q1 Assembly First quoted? YES
Q2 Directus available? dot_tools collection for registration
Q3 Nuxt available? No Nuxt changes needed — DOT tools are bash scripts
Q4 New code lines? ~150 lines dot-pivot-declare + ~200 lines dot-pivot-health
Q5 DOT tools reuse? Pattern from dot-pg-views-ensure (SSH+psql)

DOT Tools Created

DOT-113: dot-pivot-declare

  • File: dot/bin/dot-pivot-declare
  • Single mode: --source <table> --name "<name>" [--filter] [--group] [--level]
  • Batch mode: --auto-from-meta-catalog (reads from meta_catalog, no hardcode)
  • Idempotent: duplicate check before INSERT
  • Test: --auto-from-meta-catalog → "0 new" (all already declared from M1)

DOT-114: dot-pivot-health

  • File: dot/bin/dot-pivot-health
  • 7 checks: H1 execution, H2 counts, H3 source_objects, H4 coverage, H5 orphans, H6 duplicates, H7 cross-check
  • --fix mode: auto-repair H4 (declare missing) + H5 (deactivate orphans)
  • Test output:

VERIFY NUXT


Summary

# Check Status
1 Step 0 quotes DONE
2 dot-pivot-declare created + works DONE
3 --auto-from-meta-catalog works DONE
4 dot-pivot-health 7 checks work DONE
5 2 tools registered dot_tools DONE (DOT-113, DOT-114)
6 Local build PASS DONE
7 1 PR, 1 commit DONE (PR #641)
8 CI GREEN (no --admin) DONE
9 0 manual deploy DONE
10 Production URL verified DONE
11 Report uploaded DONE

Mission 2 COMPLETE. Next: Mission 3 (VIEW cross-table).