Current State — FIX7 P0 Production-Shaped Clone Rehearsal & CI Gate Design (2026-06-12)
Current State - FIX7 P0 Production-Shaped Clone Rehearsal & CI Gate Design (2026-06-12)
Status: FIX7_P0_PRODUCTION_SHAPED_CLONE_REHEARSAL_READY_NOT_APPLIED
Host: T1 OR T2 / CLEAN TERMINAL . Authority: SHAPED-CLONE-REHEARSAL-ONLY (not production authority)
Delegation consumed: AUTHORIZE_PRODUCTION_SHAPED_CLONE_REHEARSAL_ONLY
Production mutation: NO . REAL_RUN/QT001/cutover: NO . CI/deploy trigger: NO . secrets: NO . live contact: NO
On 2026-06-12, under the GPT-delegated decision AUTHORIZE_PRODUCTION_SHAPED_CLONE_REHEARSAL_ONLY,
this lane attempted to prove the birth/rollback flow on a production-shaped (isolated) clone and to
design the missing CI seal-vs-bytes gate. The rehearsal could not run - no operator-provided
production-shaped clone exists - so it stops at READY_NOT_APPLIED. All clone-independent work was
completed.
What is true now
- No safe production-shaped clone available (
NO_SAFE_PRODUCTION_SHAPED_CLONE_AVAILABLE). Disk + KB searched; no live production contacted; no secrets used. Rehearsal/rollback legsNOT_APPLIED. - Production-shaped clone requirement specified - clone-provenance.json (exact operator input)
- schema-compatibility.json (the schema a future clone must satisfy).
- Hardened validator re-proven - byte-exact
e6547e69..956c47,--selftestPASS, fabricated no-mutation rollback fails closed. - CI seal-vs-bytes gate DESIGNED off-production - design doc + reference fail-closed checker; selftest fails closed on sha mismatch, byte-length mismatch, em-dash/Unicode drift, ensure_ascii JSON re-encode drift, BOM, CRLF, missing file (7/7); passes only byte-identical. No CI triggered.
- Bad-input probes 10/10 fail closed; control allowed; no production/seal/cutover token leaked.
Evidence
Packet knowledge/dev/reports/architecture/fix7-p0-production-shaped-clone-rehearsal-ci-gate-packet-2026-06-12/
(21 files local, tree 2fa3d54e9d8335518c7974e1e6b99616344bcb743d3dc794d7858322b53c46da, commands.sh OVERALL
PASS, RERUN.sh PASS/MATCH; KB mirror 20 files - canonical validator e6547e69 referenced not duplicated).
Report (md+json), decision packet ...-after-shaped-clone-rehearsal-2026-06-12.md, checkpoint, this
current-state, governance addendum.
Production status
BLOCKED - 7 OPEN. FIX7-P0-DRYRUN-PROD-ROLLBACK-1 production-shaped leg OPEN (needs operator
clone). FIX7-P0-PROD-CI-SCOPE-1 design delivered off-production, stays OPEN (owner adopt + operator
wire). FIX7-P0-OPERATOR-INPUT-1 narrowed to "production-shaped DB dump clone". Default
HOLD_PRODUCTION. The shaped-clone-rehearsal grant does not extend to production.
Governance
TKT-OBJ-495..507 reserved via standalone addendum, APPLY_NOW=NO, above ceiling 494; canonical
registry JSON rev24 / MD rev24 / 00-index rev116 untouched; canonical body max remains 461.
Lineage
Continues FIX7_P0_PRODUCTION_REHEARSAL_ONLY_ROLLBACK_READY (toy-clone leg) and
FIX7_P0_PRODUCTION_READINESS_SURFACE_SCOPING_READY. P7 does not authorize production; a clone
rehearsal (even were it run) is not production execution; a CI gate design is not a wired CI gate.
Next
Owner/operator production decision (default HOLD). If not HOLD: operator provides the production-shaped, secret-free, isolated DB dump clone; separately-authorized lane proves snapshot/restore on it under the hardened validator (no production contact) before any production OPT-4 / REAL_RUN / QT001 / cutover. CI gate adoption is a separate owner decision.